Architecture · Service contract
Ilz Highway Maintenance Center Relocation and Adaptation
Adaptation and expansion of an existing ASFiNAG-owned property to create a fully functional highway maintenance center, including office building renovation, construction of a washing hall, operational fuel station, silo and brine plant foundations, waste…
- Deadline
- Closed 51 days ago
- Location
- Austria
About the project
Adaptation and expansion of an existing ASFiNAG-owned property to create a fully functional highway maintenance center, including office building renovation, construction of a washing hall, operational fuel station, silo and brine plant foundations, waste logistics, and outdoor facilities.
Scope of work
Comprehensive planning and project management services for the adaptation of an existing property into a highway maintenance center, including conceptual and detailed planning, statutory approval documentation, tender preparation, bid evaluation, and coordination of specialist planning (HVAC, electrical, etc.).
Deliverables
- building permit application documents
- workplace approval documentation
- detailed and tender planning documents
- tender documents and specifications
- bid evaluation reports and award recommendations
- coordination of specialist planning (HKLSE)
Required services
- architectural planning
- structural engineering
- statutory approval management
- tender preparation and bid evaluation
- project management under the Construction Site Coordination Act (BauKG)
- coordination of HVAC, electrical, and other specialist planning
Pelenoir assessment
The project involves the relocation and adaptation of a highway maintenance center, requiring a combination of architectural design, engineering, and project management services. The primary focus is on architectural planning for the building adaptation and engineering for technical infrastructure, with secondary emphasis on project management and coordination under statutory requirements.
-
Architecture 40%
Architectural planning for the adaptation and expansion of the existing property, including conceptual and detailed design of the office building, washing hall, and outdoor facilities.
-
Engineering 35%
Structural engineering, civil engineering, and technical planning for the washing hall, silo and brine plant foundations, fuel station, and waste logistics infrastructure.
-
Project management under the Construction Site Coordination Act (BauKG), including statutory approval management, tender preparation, bid evaluation, and coordination of specialist planners.
How to take part
What to submit
- electronic submission of offers
Award criteria
- technically and economically most advantageous offer
Tender documents
The visible document package includes two ZIP archives labeled for the Ilz highway maintenance center adaptation project. The first, 'Beilagen_Adaptierung_ABM Ilz neu_Bauplanung.zip,' likely contains annexes such as existing condition surveys, preliminary design sketches, or reference plans for the office building, washing hall, and outdoor facilities. The second, 'Ausschreibung_Adaptierung_ABM Ilz neu_Bauplanung.zip,' probably holds the core tender documents, including contractual terms, technical specifications, and submission forms. A file type hint suggests the presence of spreadsheets (XLS), which may include cost estimates, schedules, or bid forms. The exact contents of the ZIP files remain uncertain, as the portal requires login and the files were not downloaded.
Source
Published on Austrian Public Procurement Search. Original title: ABM Ilz - Neuer Standort - ABM Ilz - Neuer Standort - Bauplanung & Projektleitung gemäß BauKG.
Summary and assessment prepared by Pelenoir from the public notice (28 Sep 2026). The original notice and its documents are binding. Page updated 7 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
