About the project

General planning services for the refurbishment of the existing ice and multi-purpose hall in Amstetten, including technical and operational concepts.

Scope of work

General planning services for the refurbishment of the ice and multi-purpose hall, including the preparation of a technical concept, operational concept, and presentation of key personnel. The contract is suitable for small and medium-sized enterprises (SMEs).

Deliverables

  • Technical concept (Technikkonzept)
  • Operational concept (Abwicklungskonzept)
  • Presentation of key personnel

Required services

Pelenoir assessment

The project involves the refurbishment of an existing ice and multi-purpose hall, requiring a combination of architectural design and engineering services. The scope is evenly split between architectural planning for spatial and aesthetic upgrades and technical engineering for structural and operational improvements.

  • Architectural design and conceptual planning for the refurbishment of the ice and multi-purpose hall, including spatial reconfiguration and aesthetic integration of technical requirements.

  • Structural, building-services, and technical engineering for the refurbishment, including the development of a technical concept (Technikkonzept) and operational concept (Abwicklungskonzept).

How to take part

Who can apply

  • Procedure conducted in successive phases with possible exclusion of participants
  • Maximum of 6 bidders invited to the second phase, minimum of 4
  • Names and professional qualifications of personnel required for participation application

What to submit

  • Participation applications in German
  • Electronic submission required

Award criteria

  • Technical concept (25% weighting)
  • Operational concept (25% weighting)
  • Presentation of key personnel (10% weighting)
  • Offer price within a predefined fee corridor (40% weighting)

Source

Published on Austrian Public Procurement Search. Original title: Amstetten-Sanierung Eis- und Mehrzweckhalle-Generalplanersuche.

Summary and assessment prepared by Pelenoir from the public notice (21 Nov 2026). The original notice and its documents are binding. Page updated 18 Nov 2026.