Tenders of Europe project card: Historic maritime building interior refurbishment in Bordeaux, Bordeaux, France
Featured in the daily edition, 29 Nov 2026

About the project

Full architectural and engineering design services for the interior refurbishment of the Hôtel de la Marine, a historic building in Bordeaux. The project includes base missions from preliminary design to construction supervision and handover, plus complementary studies, cost estimates, coordination and communication materials.

Why it matters

Heritage refurbishment in Bordeaux demands full architectural and engineering design, turning heritage constraints into the first spatial rulebook for daily circulation.

The Hôtel de la Marine in Bordeaux is procuring full architectural and engineering design services for its interior refurbishment, including base missions from preliminary design to construction supervision.

This turns architectural design from a technical requirement into a spatial rulebook for how the building is used daily. Heritage layers, modern needs, and circulation all follow the same quiet logic.

Scope of work

Full architectural and engineering design services for the interior refurbishment of the Hôtel de la Marine, including base missions (preliminary design, detailed design, tender documents, construction supervision and handover) and complementary services (diagnostic studies, cost estimates, coordination and communication materials).

Deliverables

  • preliminary design (Esquisse - ESQ)
  • outline design (Avant-Projet Sommaire - APS)
  • detailed design (Avant-Projet Définitif - APD)
  • final project (Projet - PRO)
  • tender documents (Dossier de Consultation des Entreprises - DCE)
  • execution studies approval (Visa des études d’exécution - VISA)
  • construction supervision (Direction de l’exécution du contrat de Travaux - DET)
  • handover assistance (Assistance à maîtrise d’ouvrage lors des Opérations de Réception - AOR)
  • diagnostic studies (DIA)
  • quantitative cost estimates (Devis quantitatifs estimatifs - DQE)
  • coordination (Synthèse - SYN, Ordonnance Pilotage et Coordination - OPC)
  • fire safety coordination (Coordination de systèmes de sécurité incendie - CSSI)
  • communication materials for client use

Required services

  • architectural design
  • engineering design
  • cost planning
  • construction supervision
  • project coordination
  • fire safety coordination

Pelenoir assessment

This project involves the interior refurbishment of a historic maritime building in Bordeaux, with a primary focus on architectural design for the interior spaces. The scope also includes interior architecture and engineering services, such as diagnostic studies, cost planning, and fire safety coordination, reflecting a multidisciplinary approach to the refurbishment.

  • Architectural design for the interior refurbishment of the Hôtel de la Marine, including preliminary design, detailed design, tender documents, and construction supervision specific to the historic building's interior spaces.

  • Interior architecture, space planning, and fit-out design for the refurbishment of the historic building's interior, ensuring functional and aesthetic integration with the existing structure.

  • Engineering design, cost planning, and technical coordination for the interior refurbishment, including diagnostic studies, quantitative cost estimates, and fire safety coordination.

How to take part

Award criteria

  • environmental criteria

Source

Published on BOAMP. Original title: Mission de maîtrise d'œuvre - Réhabilitation intérieure de l'Hôtel de la Marine à Bordeaux.