Urban design and planning · Service contract
Highway interchange coordination: environmental and spatial planning for Vienna Airport West
Coordination of spatial and environmental planning for a new highway interchange (Anschlussstelle Flughafen West) on the A4 motorway near Vienna Airport.
- Deadline
- 16 days left to apply
- Location
- Vienna, Lower Austria, Austria
About the project
Coordination of spatial and environmental planning for a new highway interchange (Anschlussstelle Flughafen West) on the A4 motorway near Vienna Airport. The project aims to relieve the existing Flughafen interchange and improve access to airport operational sites while separating passenger traffic from cargo and freight traffic.
Scope of work
Coordination of spatial and environmental planning for the new A4 highway interchange Flughafen West, including technical and environmental assessments, stakeholder coordination, and preparation of planning documents. The contract includes an option for extension until 31 December 2031.
Deliverables
- Spatial and environmental coordination reports
- Technical planning documents
- Contract-specific performance records (Leistungsverzeichnis)
- Bietererklärung (bidder declaration)
Required services
- Spatial planning coordination
- Environmental planning and impact assessment
- Technical and engineering consultancy
- Stakeholder and authority coordination
Pelenoir assessment
This project focuses on the coordination of spatial and environmental planning for a new highway interchange near Vienna Airport. The primary discipline is urban design and planning, supported by engineering and technical consultancy for infrastructure integration, as well as environmental planning to address sustainability and regulatory compliance. The scope does not include detailed architectural design, construction, or interior work, but rather strategic and technical planning for transport infrastructure.
-
Coordination of spatial planning for the new highway interchange, including land-use integration, traffic flow optimization, and alignment with regional development goals. This involves stakeholder engagement and authority coordination to ensure the interchange fits within the broader urban and environmental context.
-
Engineering 30%
Technical and engineering consultancy for the highway interchange, including infrastructure design, traffic engineering, and integration with existing motorway systems. This may also cover preliminary structural and civil engineering assessments.
-
Sustainability 20%
Environmental planning and impact assessment for the interchange, including sustainability considerations, ecological mitigation, and compliance with environmental regulations. This ensures the project minimizes its environmental footprint and adheres to legal requirements.
How to take part
Who can apply
- Open to bidders without restrictions on access to documents
- Submissions must be in German
- Electronic submission required via www.provia.at
- Consortia allowed with maximum 2 members
What to submit
- Completed bidder declaration (D.6_Bietererklärung_KU.pdf)
- Technical and financial offer in German
- Electronic submission via the designated portal
Award criteria
- Price: evaluated as the net total price according to tender documents
- Quality: evaluated according to tender documents
Tender documents
The visible documents likely include the full set of tender and contract conditions, such as general and special contractual terms (D.1, D.4 series PDFs). Technical specifications and performance records (D.3, D.5 series) outline the required spatial and environmental coordination tasks, including corrected versions. The bidder declaration form (D.6) is explicitly required for submission. A detailed project description (D.2) provides context on the interchange's purpose, location, and objectives. It is unclear whether detailed engineering drawings or GIS data are included, as filenames suggest planning documents rather than construction-ready designs.
Source
Published on Austrian Public Procurement Search. Original title: A4 Anschlussstelle Flughafen West - Koordination Raum und Umwelt.
Summary and assessment prepared by Pelenoir from the public notice (28 Nov 2026). The original notice and its documents are binding. Page updated 25 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.


