About the project

Implementation and enhancement of building technical management (GTB) systems for the Pont de Bois campus and the Medical Faculty Research Pole at the University of Lille.

Scope of work

Provision of project management (maîtrise d’œuvre) services for the deployment and reinforcement of building technical management (GTB) systems at two university sites. The project includes site visits, technical phases, and compliance with social and environmental criteria.

Deliverables

  • Project management services for GTB deployment and reinforcement

Required services

  • Building technical management (GTB) system design and implementation
  • Project management (maîtrise d’œuvre)

Pelenoir assessment

This project primarily involves the technical engineering and planning of building technical management (GTB) systems for university infrastructure, supported by project management services for implementation. The scope is focused on system design, integration, and reinforcement, with no indication of architectural design, interior work, or other AEC disciplines.

  • Design, implementation, and reinforcement of building technical management (GTB) systems, including technical planning, system integration, and infrastructure upgrades for the university sites.

  • Project management (maîtrise d’œuvre) services, including coordination, compliance oversight, and delivery of the GTB system implementation.

How to take part

Who can apply

  • Compliance with exclusion grounds as per French public procurement law (Code de la commande publique)
  • No reserved procurement

What to submit

  • Submission via electronic means (e-submission required)
  • Documents in French

Award criteria

  • Quality-based award criteria (details in the consultation regulations)

Source

Published on BOAMP. Original title: Marché 2026E008 - Maîtrise d’œuvre pour le déploiement et le renforcement de la gestion technique des bâtiments des sites de Point de Bois et du Pôle Recherche de la faculté de médecine de l’Unive....

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 30 Sep 2026.