Project and construction management · Service contract
Grodzisk Mazowiecki street lighting and municipal monitoring network construction supervision
Supervision of construction works for a new 0.4kV street lighting network, power supply lines (WLZ), and municipal monitoring system around the municipal swimming pool and sports hall in Grodzisk Mazowiecki.
- Deadline
- Closed 30 days ago
- Location
- Grodzisk Mazowiecki, Mazowieckie, Poland
About the project
Supervision of construction works for a new 0.4kV street lighting network, power supply lines (WLZ), and municipal monitoring system around the municipal swimming pool and sports hall in Grodzisk Mazowiecki. Includes electrical, electrotechnical, and telecommunication branches, as well as post-construction warranty and defect liability period supervision.
Scope of work
Supervision of construction works for street lighting network (0.4kV), power supply lines (WLZ), and municipal monitoring system. Includes electrical and telecommunication branches, coordination with utility providers, geodetic works, traffic organization, and post-construction warranty supervision (48 months).
Deliverables
- Supervision of cable line construction for street lighting
- Supervision of power supply connection for street lighting
- Supervision of lighting control cabinet (SOK) installation and activation
- Supervision of WLZ power supply line construction and connection
- Supervision of grounding system installation
- Coordination with distribution system operator (PGE Dystrybucja S.A.) for meter relocation and phase labeling
- Supervision of municipal monitoring system cable line construction
- Supervision of telecommunication network relocation
- Supervision of pavement demolition, protective pipe installation, and reinstatement
- Supervision of geodetic works (staking, as-built inventory)
- Temporary traffic organization and signage during construction
- Supervision of installation testing, measurements, and as-built documentation preparation
- Supervision during 48-month warranty and defect liability period
Required services
- Construction supervision (inspector nadzoru inwestorskiego)
- Electrical and electrotechnical supervision
- Telecommunication supervision
Pelenoir assessment
The project is primarily a construction supervision assignment for municipal infrastructure, focusing on oversight of electrical and telecommunication works. While the core scope is project and construction management, technical engineering oversight is also required for the electrical and monitoring systems.
-
Supervision of construction works for the new 0.4kV street lighting network, power supply lines (WLZ), and municipal monitoring system, including coordination with utility providers, geodetic works, traffic organization, installation testing, and post-construction warranty supervision.
-
Engineering 20%
Technical oversight of electrical infrastructure (0.4kV street lighting, WLZ power supply lines) and telecommunication systems (municipal monitoring network), including grounding systems, meter relocation, and compliance with technical standards.
How to take part
Who can apply
- Minimum 2 years of experience as a construction supervision inspector or electrical works manager in the electrical and electrotechnical field
- Valid construction supervision license (uprawnienia budowlane) without limitations in the electrical and electrotechnical specialty, or equivalent
- Experience in supervising at least one street lighting construction/upgrade project valued at minimum PLN 1,500,000 gross within the last 5 years
- Demonstrated technical and professional capacity for the required supervision tasks
What to submit
- Offer form (Formularz Ofertowy, Załącznik nr 1 do SWZ)
- Statutory declarations as per Rozdział X SWZ
- Documentation proving eligibility and experience (referencje, Załącznik nr 3 do SWZ)
- List of personnel assigned to the contract with qualifications and experience details (Załącznik nr 4 do SWZ)
- Power of attorney for consortium representatives (if applicable, Załącznik nr 7 do SWZ)
- Consortium member task allocation statement (if applicable, Załącznik nr 8 do SWZ)
Award criteria
- Price (60% weight, lowest bid receives 60 points, others proportionally)
- Experience of the electrical and electrotechnical works supervision inspector (40% weight, 0-40 points based on number of relevant projects supervised)
Source
Published on e-Zamowienia. Original title: Pełnienie funkcji inspektora nadzoru dla zadania: "Budowa sieci elektroenergetycznej 0,4kV oświetlenia ulicznego i linii WLZ oraz sieci monitoringu miejskiego w Grodzisku Mazowieckim”.
Summary and assessment prepared by Pelenoir from the public notice (23 Oct 2026). The original notice and its documents are binding. Page updated 22 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
