About the project

Comprehensive investor supervision for the reconstruction of the road network to improve accessibility for residents of the entire region to service centres in Opole. The project includes reconstruction of intersections for two-way traffic on Reymonta and Kołłątaja streets, construction of stormwater drainage systems on Ozimska, Reymonta, Kołłątaja streets and Wolności Square, and project promotion through installation of information boards. An optional phase involves additional stormwater drainage construction.

Scope of work

Comprehensive investor supervision for road network reconstruction, including intersection upgrades, stormwater drainage construction, and project promotion. The contract includes a guaranteed scope (three phases) and an optional fourth phase for additional stormwater drainage. The optional scope must not be less than 10% of the total contract value.

Deliverables

  • Investor supervision for road and stormwater drainage reconstruction
  • Coordination of construction works
  • Project documentation oversight
  • Installation of information boards for project promotion

Required services

Pelenoir assessment

This project is primarily focused on project and construction management services for a road network upgrade and stormwater drainage construction in Opole. The scope includes investor supervision, coordination of construction works, and oversight of technical documentation, with secondary involvement in engineering and technical planning for the infrastructure upgrades.

  • Comprehensive investor supervision, including coordination of construction works, oversight of project documentation, technical inspection, and management of the road network reconstruction and stormwater drainage construction.

  • Technical planning and oversight of structural and civil engineering aspects, including intersection upgrades and stormwater drainage system construction.

How to take part

Who can apply

  • Contractor must demonstrate experience in road construction supervision and stormwater drainage projects
  • Key personnel must hold unlimited construction licenses in road engineering
  • Contractor must provide references for similar completed projects within the last 7 years
  • Consortium members may jointly meet eligibility requirements

What to submit

  • Electronic offer signed with qualified electronic signature
  • Completed submission forms (attachments 2–4) included with the offer
  • Additional documents (attachments 5–6) may be requested after offer evaluation
  • Documents must be in Polish

Award criteria

  • Price (60% weight)
  • Experience of contractor's personnel (40% weight)

Source

Published on e-Zamowienia. Original title: Pełnienie kompleksowego nadzoru inwestorskiego dla Projektu: „Przebudowa układu komunikacyjnego dla poprawy dostępności mieszkańców całego województwa do centrów usług w Opolu”.

Summary and assessment prepared by Pelenoir from the public notice (20 Nov 2026). The original notice and its documents are binding. Page updated 19 Nov 2026.