About the project

Design and supervision services for refurbishment of an existing greenway cycle route due to structural issues, and extension of the current path with new connections to the north and south.

Scope of work

Design and supervision services for two lots: (1) refurbishment of the existing greenway cycle route due to structural issues and site redevelopment; (2) extension of the current greenway with new connections to the north and south, including landscaping and related works.

Deliverables

  • Design and supervision services for refurbishment and redevelopment (Lot 1)
  • Design and supervision services for extension and new connections (Lot 2)

Required services

Pelenoir assessment

The project primarily involves urban design and planning for the refurbishment and extension of a greenway cycle route, with secondary focus on landscape architecture for outdoor environment design and engineering for structural and technical planning. The scope is divided into two lots covering design, supervision, and related works for the existing path and new connections.

  • Design and planning of the greenway cycle route refurbishment and extension, including spatial integration of new connections to the north and south within the urban and peri-urban context.

  • Landscaping and outdoor environment design for the greenway cycle route, including planting, open-space integration, and site redevelopment.

  • Technical engineering for the structural refurbishment of the existing cycle path and infrastructure planning for new connections, including civil and pathway engineering.

How to take part

Who can apply

  • Open to all qualified tenderers
  • SME-suitable
  • Electronic signature required for submission
  • E-invoicing required for contract execution

What to submit

  • Electronic submission required
  • Compliance with selection criteria as per procurement documents

Source

Published on BOAMP. Original title: Maîtrise d’œuvre pour la réalisation de travaux d’aménagement sur la véloroute voie-verte.

Summary and assessment prepared by Pelenoir from the public notice (23 Nov 2026). The original notice and its documents are binding. Page updated 22 Nov 2026.