About the project

Comprehensive renovation of the 08R/26L runway at Fliegerhorst Hinterstoisser air base, including project leader support (Projektleiterunterstützung, PLU) and construction supervision services for the infrastructure upgrade.

Scope of work

Support and supervision services for the comprehensive renovation of the 08R/26L runway at Fliegerhorst Hinterstoisser, including project leader support (Projektleiterunterstützung, PLU) and construction control (Kontrolle) as civil engineering services.

Deliverables

  • Project leader support (PLU) for runway renovation
  • Construction supervision and control services

Required services

  • project management in construction
  • construction supervision
  • civil engineering support

Pelenoir assessment

This project primarily involves the comprehensive renovation of a military airfield runway, with a strong focus on engineering and technical planning for infrastructure upgrades. Secondary support includes project leadership and construction supervision services to ensure the successful execution of the renovation.

  • Technical planning, structural engineering, and civil engineering support for the comprehensive renovation of the 08R/26L runway, including infrastructure upgrades and compliance with aviation standards.

  • Project leader support (PLU) and construction supervision services, including coordination, quality control, and adherence to timelines for the runway renovation.

How to take part

Who can apply

  • Bieteranfragen must be anonymized and submitted only via the procurement platform
  • Non-anonymized requests are grounds for exclusion
  • Submission of a power of attorney for non-signatory employees is mandatory
  • Electronic invoicing is required

What to submit

  • Submission of tender documents must be in individual files uploaded to the procurement platform
  • Offers must be submitted in German
  • Electronic submission is mandatory

Source

Published on Austrian Public Procurement Search. Original title: E90094/74/1-Dion7/2026, 8740 Zeltweg, Fliegerhorst 1, Fliegerhorst HINTERSTOISSER, Obj. 805, Generalsanierung Piste 08R/26L, Projektleiterunterstützung (PLU) und Kontrolle.

Summary and assessment prepared by Pelenoir from the public notice (23 Oct 2026). The original notice and its documents are binding. Page updated 22 Oct 2026.