About the project

Design and cost documentation for the reconstruction and expansion of internal gas installations in three municipal housing units managed by ADM in Bydgoszcz. The project includes replacing existing heating systems with individual dual-function gas boilers, installing new radiators, hot water systems, and ventilation, and removing outdated tile stoves and water heaters. Each unit requires verified building inventories or new surveys if unavailable.

Scope of work

Deliverables

  • Design documentation for gas installation reconstruction and expansion
  • Cost estimates for the proposed works
  • Building inventories or surveys if unavailable
  • Project submissions for administrative approval (building permits or notifications)
  • Final documentation with all opinions and approvals

Required services

  • Architectural and engineering design services
  • Building surveying and inventory verification
  • Cost estimation and budgeting
  • Administrative submission support for building permits

Pelenoir assessment

This project primarily involves engineering and technical planning for the redesign of internal gas installations in municipal housing units, including heating, ventilation, and hot water systems. A secondary but essential component is the verification or creation of building inventories and surveys to support the design process.

  • Design and technical planning for the reconstruction and expansion of internal gas installations, including the replacement of heating systems with individual dual-function gas boilers, installation of new radiators, hot water systems, and ventilation, as well as the removal of outdated tile stoves and water heaters.

  • Surveying 20%

    Verification or creation of building inventories and surveys for the three municipal housing units to support the design and technical planning process.

How to take part

Who can apply

  • Contractors must comply with Polish public procurement law (art. 94 ustawy)
  • Contractors must submit declarations of no exclusion grounds (art. 125 ust. 1 ustawy)
  • Contractors must provide required corporate documents (KRS, CEIDG, or equivalent)

What to submit

  • Completed offer form (Formularz Ofertowy) as per client template
  • Declaration of no exclusion grounds (oświadczenie o braku podstaw wykluczenia)
  • Power of attorney (if applicable)
  • Corporate registration documents (KRS, CEIDG, or equivalent)

Award criteria

  • Price (60% weight)
  • Warranty period for defects (40% weight)

Source

Published on e-Zamowienia. Original title: 74/PM/2026 Wykonanie dok. proj.-koszt. na przebudowę i rozbudowę wewnętrznej instalacji gazowej dla gminnych lokali mieszkalnych zarządzanych przez „ADM” Sp. z o.o. w Bydgoszczy.

Summary and assessment prepared by Pelenoir from the public notice (14 Nov 2026). The original notice and its documents are binding. Page updated 13 Nov 2026.