About the project

Design of a new foot and cycle bridge over the Sill river to connect the existing underpass to Anzengruberstraße and the eastern tram line at Innsbruck main station. The contract covers preliminary design, with optional subsequent submission and detail planning stages.

Scope of work

Design services for a new foot and cycle bridge over the Sill river, including preliminary design (Vorentwurf). Optional subsequent stages include submission planning (Einreichplanung) and detail planning (Detailplanung).

Deliverables

  • Preliminary design (Vorentwurf) for the Sill bridge
  • Optional submission planning (Einreichplanung)
  • Optional detail planning (Detailplanung)

Required services

  • Bridge design
  • Preliminary design
  • Submission planning
  • Detail planning
  • Cost estimation

Pelenoir assessment

This project primarily involves the architectural and design planning of a new foot and cycle bridge over the Sill river at Innsbruck main station, with a secondary focus on the necessary structural and technical engineering. The scope covers preliminary design, with optional subsequent stages for submission and detail planning, reflecting a multidisciplinary approach combining design and engineering disciplines.

  • Architectural concept and design of the new foot and cycle bridge over the Sill river, including form, aesthetics, user experience, and integration with the surrounding urban context.

  • Structural and technical engineering for the bridge, including load-bearing calculations, material specifications, and compliance with infrastructure standards for foot and cycle bridges.

How to take part

Who can apply

  • Open to bidders without reserved participation
  • Eligibility criteria specified in tender documents

What to submit

  • Participation applications in German
  • Electronic submission required via www.provia.at

Award criteria

  • Technically and economically most advantageous offer

Tender documents

The visible files include PDF documents labeled as 'Grundlagen des Vergabeverfahrens' (tender procedure basics), 'Aufgabenstellung' (task assignment), 'Projektbeschreibung' (project description), and 'Teilnahmeantrag' (participation application form). These likely contain the tender conditions, detailed project brief, design requirements, and the form for submitting participation applications. The file 'oebb_AGB_DL_2021_01.pdf' appears to be the general terms and conditions for service contracts. The exact content of the XLS file type mentioned for document upload is not specified, so its purpose remains unclear.

Source

Published on Austrian Public Procurement Search. Original title: Innsbruck Hbf; Fuß- und Radwegunterführung; Planung - Planung Sillbrücke.

Summary and assessment prepared by Pelenoir from the public notice (13 Nov 2026). The original notice and its documents are binding. Page updated 12 Nov 2026.