About the project

Comprehensive engineering design for a flood protection and rainwater retention reservoir with a dry polder in Bieruń, including hydrological analysis, two conceptual variants, multi-discipline construction documentation, and securing all necessary permits and approvals. Optional author supervision during construction may be awarded separately.

Why it matters

Engineering design for a 5,000 m³ flood protection and rainwater retention reservoir, including hydrological analysis and conceptual variants for a dry polder.

Scope of work

The contract covers the preparation of full engineering documentation for a flood protection and rainwater retention reservoir with a dry polder, including hydrological-hydraulic analysis, two conceptual variants, multi-discipline construction design, securing all necessary permits, and optional author supervision during construction.

Deliverables

  • Hydrological-hydraulic analysis with terrain development directions
  • Two conceptual variants for the reservoir and dry polder
  • Multi-discipline construction design and cost documentation
  • All necessary opinions, agreements, permits and decisions for construction
  • Final building permit decision
  • Optional: author supervision during construction (up to 10% of the base contract value)

Required services

  • Architectural and engineering design services
  • Civil and water engineering design
  • Project preparation and cost estimation
  • Approval plans, working drawings and specifications
  • Project and documentation supervision

Pelenoir assessment

This project is primarily an engineering and technical planning endeavor focused on the design and permitting of a flood protection and rainwater retention reservoir. The scope includes significant civil and hydrological engineering work, with secondary involvement in project and construction management for coordination, approvals, and optional supervision.

  • Structural, civil, and hydrological engineering design for the flood protection reservoir, including hydrological-hydraulic analysis, conceptual variants, construction documentation, and securing permits for the 5,000 m³ water retention basin.

  • Coordination of the design process, securing necessary permits and approvals, and optional author supervision during construction to ensure compliance with the project scope and regulatory requirements.

How to take part

Who can apply

  • Contractor must demonstrate at least one person with unlimited hydrotechnical engineering design qualifications and experience in designing retention reservoirs of at least 5,000 m³ capacity with a final building permit obtained within the last three years
  • Contractors may jointly apply; at least one must fully meet the experience requirement

What to submit

  • Offers must be submitted electronically via the designated procurement platform
  • Documents must be prepared in Polish
  • Required: proof of qualifications, experience, and compliance with exclusion criteria

Award criteria

  • Price (60%)
  • Designer experience (30%)
  • Documentation correction timeline (10%)

Source

Published on e-Zamowienia. Original title: Budowa zbiornika w Bieruniu w rejonie terenów inwestycyjny przy ul. Ekonomicznej (dokumentacja).