Engineering · Service contract
Fißlthalerwehr Fish Pass and Hydropower Plant
Construction of a fish pass (Fischwanderhilfe) and a hydropower plant at the Fißlthalerwehr weir, including general planning services for engineering and design.
- Deadline
- Closed 50 days ago
- Location
- Salzburg, Salzburg, Austria
About the project
Construction of a fish pass (Fischwanderhilfe) and a hydropower plant at the Fißlthalerwehr weir, including general planning services for engineering and design.
Scope of work
General planning services for the design and engineering of a fish pass and hydropower plant at the Fißlthalerwehr weir, including all required submissions for an open procedure.
Deliverables
- general planning services
- engineering and design documentation
Required services
- engineering services
- planning services
Pelenoir assessment
The project primarily involves engineering and technical planning for a hydropower plant and fish pass, with secondary urban design and planning considerations to integrate the infrastructure into the existing urban and water environment.
-
Engineering 80%
Structural, civil, and technical engineering for the hydropower plant and fish pass, including hydraulic design, structural calculations, and infrastructure integration at the Fißlthalerwehr weir.
-
Integration of the hydropower plant and fish pass into the existing urban and water infrastructure, including spatial planning and public-realm considerations for the Fißlthalerwehr site.
Source
Published on Austrian Public Procurement Search. Original title: W6243 Fischwanderhilfe & Wasserkraftwerk Fißlthalerwehr, Generalplanerleistungen.
Summary and assessment prepared by Pelenoir from the public notice (28 Sep 2026). The original notice and its documents are binding. Page updated 18 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.