About the project

Preparation of multi-discipline design and cost documentation for the expansion and thermal modernization of the municipal office building in Szczekociny, including obtaining a building permit. The documentation will cover architectural, structural, sanitary, electrical, and road engineering disciplines.

Scope of work

Deliverables

  • Multi-discipline design and cost documentation for building expansion and thermal modernization
  • Building permit documentation

Required services

Pelenoir assessment

This project primarily involves the preparation of multi-discipline design and cost documentation for the expansion and thermal modernization of a municipal office building. The scope is dominated by architectural design and engineering disciplines, with a significant focus on thermal modernization and energy efficiency improvements. The project explicitly requires architectural, structural, sanitary, electrical, and road engineering services, as well as the integration of sustainability measures.

  • Architectural concept, building design, and overall design coordination for the expansion and thermal modernization of the municipal office building, including integration of all engineering disciplines.

  • Structural, sanitary, electrical, and road engineering design services for the building expansion and thermal modernization, ensuring technical compliance and integration with the architectural design.

  • Thermal modernization measures, energy efficiency improvements, and sustainability considerations for the building's performance and certification compliance.

How to take part

Who can apply

  • Contractor must have executed at least one design and cost documentation for thermal modernization, expansion, reconstruction, or construction of a building with a minimum volume of 2,000 m³ in the last 5 years
  • Contractor must employ or have access to personnel with specific professional qualifications and experience in architectural, structural, sanitary, electrical, and road engineering design
  • Contractor must personally execute the architectural and structural design documentation (no subcontracting or third-party resources allowed for these disciplines)

What to submit

  • Electronic offer form signed with a trusted, personal, or qualified electronic signature
  • Statement on non-exclusion and fulfillment of participation conditions (art. 125(1) of the Polish Public Procurement Law)
  • Power of attorney (if applicable)
  • Declaration on the use of third-party resources (if applicable)
  • Confidentiality statement for business secrets (if applicable)

Award criteria

  • Price (100% weight)

Tender documents

The visible document package includes three files: a contract notice PDF, a terms of reference (SWZ) PDF, and a ZIP archive containing annexes and submission forms. The contract notice likely contains the official tender announcement and procedural details. The SWZ file probably outlines the technical, legal, and administrative requirements for the design documentation, including eligibility criteria and submission instructions. The ZIP archive is expected to contain supplementary materials such as templates for offers, statements, and other forms required for participation. The exact contents of the ZIP file cannot be confirmed without access, but it likely supports the preparation of a compliant submission.

Source

Published on e-Zamowienia. Original title: Rozbudowa i termomodernizacja budynku administracyjnego UMiG Szczekociny - opracowanie dokumentacji projektowo - kosztorysowej.

Summary and assessment prepared by Pelenoir from the public notice (23 Oct 2026). The original notice and its documents are binding. Page updated 22 Oct 2026.