About the project

Comprehensive energy modernization of three public buildings in Duszniki-Zdrój, including roof insulation and replacement, installation of photovoltaic systems, replacement of windows and doors, and modernization of heating systems from gas to air-to-water heat pumps. The project is executed under a design-build formula and divided into three lots: (1) kindergarten at Krakowska 3, (2) Municipal School Complex at Wybickiego 2A, and (3) two school buildings at Sportowa 6 and Sprzymierzonych 6.

Scope of work

The project involves comprehensive energy modernization of three public buildings in Duszniki-Zdrój under a design-build formula. Key works include roof insulation and replacement, installation of photovoltaic systems (50–57 kW), replacement of windows and doors, modernization of heating systems from gas to air-to-water heat pumps, and related electrical and mechanical installations. The project is divided into three lots, each with specific requirements for thermal insulation, roofing, and renewable energy installations.

Deliverables

  • Design and construction documentation for energy modernization
  • Roof insulation and replacement (without structural changes)
  • Installation of photovoltaic systems (50–57 kW)
  • Replacement of windows and doors (without changing opening parameters)
  • Modernization of heating systems (replacement of gas heating with air-to-water heat pumps)
  • Installation of mechanical and electrical systems
  • Final construction and finishing works

Required services

Pelenoir assessment

This project is primarily an energy modernization initiative for public buildings, focusing on engineering and technical planning for mechanical, electrical, and renewable energy systems. It also includes architectural design for building envelope improvements, sustainability measures for energy efficiency, and construction works under a design-build delivery model.

  • Design and engineering of mechanical and electrical systems, including heating system modernization (replacement of gas heating with air-to-water heat pumps), photovoltaic system installations, and related electrical work for energy efficiency.

  • Architectural design services for the energy modernization of building envelopes, including roof insulation and replacement, and replacement of windows and doors without altering structural parameters.

  • Energy efficiency improvements, sustainability measures, and building performance optimization, including thermal insulation, renewable energy integration (photovoltaic systems), and heating system upgrades.

  • Execution of construction works, including roof insulation and replacement, installation of photovoltaic systems, replacement of windows and doors, and modernization of heating systems under a design-build contract.

How to take part

Who can apply

  • Registration in a professional or commercial register (e.g., KRS or CEIDG in Poland)
  • Civil liability insurance covering the contract value
  • Financial capacity: PLN 1,000,000 (Lot 1) or PLN 2,000,000 (Lots 2 and 3) in funds or creditworthiness
  • Experience: Completion of at least two similar thermal modernization projects for public buildings in the last five years (PLN 1,000,000–2,000,000 total value)
  • Availability of a construction manager with unlimited construction and structural qualifications and 18 months of experience in public building projects
  • Availability of design personnel with architectural and electrical engineering qualifications

What to submit

  • Offers submitted electronically via the procurement platform
  • Documents in Polish
  • Evidence of eligibility, financial capacity, and experience (e.g., references, financial statements, insurance policies)
  • List of personnel with qualifications for design and construction
  • Bid bond: PLN 12,000 (Lot 1), PLN 30,000 (Lot 2), PLN 40,000 (Lot 3)

Award criteria

  • Price (60% weight)
  • Warranty period (40% weight)

Source

Published on e-Zamowienia. Original title: Kompleksowa modernizacja energetyczna budynków publicznych w Dusznikach-Zdroju w formule zaprojektuj i wybuduj.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 4 Sep 2026.