About the project

Energetic renovation of two accommodation buildings including architectural planning, structural engineering, building physics and fire protection services.

Scope of work

Required services include architectural planning (Objektplanung Gebäude), structural engineering (Tragwerksplanung), building physics and fire protection for the energetic renovation of two accommodation buildings.

Deliverables

  • planning documents
  • structural calculations
  • building physics reports
  • fire protection concept

Required services

  • architectural planning
  • structural engineering
  • building physics
  • fire protection

Pelenoir assessment

The project involves the energetic renovation of two military accommodation buildings, requiring a multidisciplinary approach. The primary focus is architectural planning for the renovation, supported by structural engineering, building physics for energy efficiency, and specialist fire protection consulting. The scope is explicitly defined by the tender's listed services, with no indication of additional disciplines such as urban planning, landscape, or interior design.

  • Architectural planning for the energetic renovation of the accommodation buildings, including design adjustments, space planning, and compliance with energy efficiency requirements.

  • Structural engineering (Tragwerksplanung) to assess and reinforce the building structure during the renovation, ensuring stability and compliance with technical standards.

  • Building physics services to optimize energy efficiency, thermal performance, and indoor climate conditions for the renovated accommodation buildings.

  • Fire protection consulting and concept development to ensure compliance with safety regulations for the renovated buildings.

Source

Published on eVergabe Online. Original title: Werratal Kaserne Bad Salzungen, Energetische Sanierung Unterkunftsgebäude 008 und 009, Objektplanung Gebäude, Tragwerksplanung, Bauphysik, Brandschutz.

Summary and assessment prepared by Pelenoir from the public notice (11 Nov 2026). The original notice and its documents are binding. Page updated 11 Nov 2026.