Tenders of Europe project card: Emergency power readiness: feasibility study for municipal buildings, Vinje, Norway
Featured in the daily edition, 16 Nov 2026

About the project

Feasibility study to assess and plan necessary modifications to main electrical panels in selected municipal buildings for connecting external emergency power generators. The project covers community centres, care centres and waterworks, focusing on technical solutions, required rebuilds and adaptations to ensure safe and efficient emergency power connection during operational disruptions.

Why it matters

Emergency power readiness for municipal buildings ensures reliable backup during blackouts, a critical service for daily operations and safety.

Scope of work

Feasibility study to identify technical solutions, necessary rebuilds and adaptations for connecting external emergency power generators to main electrical panels in selected municipal buildings (community centres, care centres and waterworks). The study aims to ensure safe and efficient emergency power supply during operational disruptions.

Deliverables

  • Feasibility report on technical solutions for emergency power connection
  • Assessment of necessary rebuilds and adaptations to main electrical panels
  • Recommendations for safe and efficient emergency power integration

Required services

  • Engineering consultancy
  • Technical planning and design
  • Risk assessment and feasibility analysis
  • Project management and coordination

Pelenoir assessment

This project is primarily an engineering and technical planning initiative focused on assessing and designing modifications to electrical infrastructure for emergency power readiness in municipal buildings. The scope includes feasibility analysis, technical solutions, and project management, with no evidence of architectural design, interior work, or other AEC disciplines.

  • Technical planning and design of modifications to main electrical panels in municipal buildings to enable safe and efficient connection of external emergency power generators. This includes structural and electrical engineering assessments, risk analysis, and feasibility of required rebuilds and adaptations.

  • Project management and coordination of the feasibility study, including stakeholder alignment, timeline oversight, and ensuring deliverables meet the client's requirements for emergency power readiness.

How to take part

Award criteria

  • Price (70%)
  • Competence and experience of key personnel (30%)

Source

Published on Doffin. Original title: Forprosjekt - Tilrettelegging for naudstraum.

Summary and assessment prepared by Pelenoir from the public notice (16 Nov 2026). The original notice and its documents are binding. Page updated 16 Nov 2026.