About the project

Manufacture and installation of 2,100 windows, post-and-rail facades, and sun protection systems for the master planning of Eisenstadt Hospital under a framework agreement with five contractors.

Scope of work

Manufacture and installation of 2,100 windows, post-and-rail facades, and sun protection systems for Eisenstadt Hospital. The contract includes a framework agreement with five contractors, with works defined in the technical specifications and supporting documents.

Deliverables

  • 2,100 windows
  • post-and-rail facades
  • sun protection systems

Required services

  • manufacturing
  • installation

Pelenoir assessment

The project focuses on the supply and installation of building envelope components (windows, post-and-rail facades, and sun protection systems) for a hospital master plan. The primary scope lies in manufacturing these components, with secondary involvement in their physical installation.

  • Manufacture of 2,100 windows, post-and-rail facade systems, and sun protection systems tailored to the hospital's technical and design specifications.

  • Installation of the manufactured windows, post-and-rail facades, and sun protection systems on-site at Eisenstadt Hospital, including coordination with the framework agreement requirements.

How to take part

Who can apply

  • Framework agreement limited to five contractors
  • Procedure conducted in multiple phases with exclusion of participants
  • Maximum of 10 bidders invited to the second phase, minimum of 5

What to submit

  • Submission in German
  • Electronic submission required

Source

Published on Austrian Public Procurement Search. Original title: Krankenhaus der Barmherzigen Brüder Eisenstadt – Masterplanung: 2100 Fenster, Pfosten-Riegelfassade, Sonnenschutz.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 6 Oct 2026.