About the project

Construction of a new indoor swimming pool as part of the Schwechat leisure centre, including structural and finishing works under a partial general contractor agreement.

Scope of work

Partial general contractor services for structural (shell construction) and finishing works for the new indoor swimming pool at the Schwechat leisure centre site.

Deliverables

  • Structural works (shell construction)
  • Finishing works

Required services

  • General contracting for construction

Pelenoir assessment

The project primarily involves construction and general contracting services for the structural and finishing works of a new indoor swimming pool. Engineering and technical planning is also supported as a secondary discipline due to the technical complexity of swimming pool construction.

  • Delivery of structural (shell construction) and finishing works for the new indoor swimming pool as a partial general contractor, including coordination of construction activities and execution of building works.

  • Technical planning and engineering support for the structural and building-services aspects of the indoor swimming pool, including compliance with technical specifications and standards.

How to take part

Who can apply

  • Procedure conducted in successive phases with possible exclusion of participants
  • Maximum of 8 and minimum of 5 bidders invited to the second phase
  • Suitable for small and medium-sized enterprises (SMEs)
  • Eligibility criteria specified in tender documents

What to submit

  • Participation applications in German
  • Electronic submission required

Award criteria

  • Quality: Warranty extension (10% weighting)
  • Quality: Reversal of burden of proof (5% weighting)
  • Price: Offer price (85% weighting)

Source

Published on Austrian Public Procurement Search. Original title: Freizeitzentrum Schwechat / Hallenbad-Neubau / Teil-Generalunternehmerleistungen BAU.

Summary and assessment prepared by Pelenoir from the public notice (20 Nov 2026). The original notice and its documents are binding. Page updated 18 Nov 2026.