Sustainability · Works contract
Dutch Defence Real Estate Energy Efficiency Measures
Implementation of energy-saving measures (EML) across the Dutch Defence real estate portfolio to comply with legal energy-saving obligations and enhance sustainability by the end of 2029.
- Deadline
- Closed 26 days ago
- Location
- Netherlands
About the project
Implementation of energy-saving measures (EML) across the Dutch Defence real estate portfolio to comply with legal energy-saving obligations and enhance sustainability by the end of 2029. The project involves preparation and execution of measures nationwide, divided into 12 regional lots.
Scope of work
The tender requires the integral preparation and execution of energy-saving measures (EML) for Defence real estate, including technical, administrative, and legal preparations, and physical implementation of measures to meet legal energy-saving obligations by the end of 2029. The contract may be extended by 12 months and includes a two-step process for additional agreements under the NOK system.
Deliverables
- Energy-saving measures (EML) implementation
- Technical and administrative preparation of measures
- Legal and contractual preparations
- Execution of measures across Defence real estate portfolio
Required services
- building inspection services
- construction works
- project management
- technical consultancy
Pelenoir assessment
This project is primarily focused on sustainability and building performance, specifically the implementation of energy-saving measures (EML) across a nationwide real estate portfolio. It also involves significant technical engineering work for infrastructure and building-services adaptations, as well as project management to ensure compliance and timely execution.
-
Sustainability 60%
Implementation of energy-saving measures (EML) across the Dutch Defence real estate portfolio, including technical, administrative, and legal preparations to comply with legal energy-saving obligations and enhance sustainability.
-
Engineering 30%
Technical engineering and planning for energy efficiency infrastructure, including structural, building-services, and infrastructure adaptations required for the implementation of EML measures.
-
Project management and coordination for the preparation and execution of energy-saving measures, including timeline, cost, and compliance oversight across 12 regional lots.
How to take part
Who can apply
- Compliance with Uniform European Tender Document (UEA)
- No reserved participation for sheltered workshops
- Compliance with Foreign Subsidies Regulation (FSR)
What to submit
- Electronic submission via TenderNed
- Tender submission in Dutch
- Confidentiality agreement required
- Plan of approach (see tender guide paragraph 5.3)
- Completed tender form (inschrijvingsbiljet)
Award criteria
- Price (weight: 0, using 'award based on value' methodology)
- Quality: Plan of approach (weight: 0, using 'award based on value' methodology)
Tender documents
The visible document package includes tender guidelines, contract templates, and submission forms such as the 'Aanbestedingsleidraad' (tender guide) and 'Inschrijvingsbiljet' (tender form). It also contains Excel templates for reporting energy-saving measures (EML) and PDFs detailing the NOK system for additional agreements. The package likely includes technical and administrative requirements for implementing energy efficiency measures, as well as legal and compliance documents. The 7Z archive ('Bijlagen Raamovereenkomst') may contain supplementary contract annexes, but its exact contents remain unknown without access.
Images from the tender documents
Source
Published on TenderNed. Original title: Raamovereenkomst Duurzaamheid en EML-maatregelen.
Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 28 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.



