Engineering · Service contract
Design documentation for demolition and construction of three bridge structures in Silesia
Preparation of complete design documentation for the demolition and construction of three bridge structures on provincial roads in Pruchna, Hażlach, and Kończyce Wielkie.
- Deadline
- Closed 50 days ago
- Location
- Pruchna, Hażlach, Kończyce Wielkie, Silesian Voivodeship, Poland
About the project
Preparation of complete design documentation for the demolition and construction of three bridge structures on provincial roads in Pruchna, Hażlach, and Kończyce Wielkie. The project includes obtaining necessary permits and approvals for road investment decisions or building permits, ensuring compliance with load-bearing capacity standards (class I and MLC 150), and improving traffic safety for vehicles, pedestrians, and cyclists.
Scope of work
Preparation of complete design documentation for the demolition and construction of three bridge structures, divided into three tasks: (1) viaduct over railway tracks in Pruchna, (2) bridge over Piotrówka stream in Hażlach, and (3) bridge over Wschodnica river in Kończyce Wielkie. The documentation must comply with Polish regulations, technical conditions, and road authority guidelines, including necessary approvals and permits for road investment decisions or building permits. The project aims to upgrade load-bearing capacity, improve usability parameters, and enhance traffic safety.
Deliverables
- Design documentation for demolition and construction of three bridge structures
- Necessary approvals, opinions, and permits for road investment decisions or building permits
- Documentation compliant with Polish regulations and road authority guidelines
Required services
- Engineering design services for bridges
- Preparation of construction documentation
- Obtaining necessary permits and approvals
Pelenoir assessment
This project is primarily focused on engineering and technical planning for the design and reconstruction of three bridge structures, with a secondary emphasis on project coordination and regulatory compliance. The scope is dominated by structural and civil engineering tasks, including load-bearing calculations and construction documentation.
-
Engineering 90%
Structural and civil engineering design for the demolition and construction of three bridge structures, including load-bearing capacity calculations, compliance with technical standards, and preparation of construction documentation.
-
Coordination of the design process, including obtaining necessary permits and approvals for road investment decisions or building permits, and ensuring compliance with regulatory and technical requirements.
How to take part
Who can apply
- Minimum two completed design documentations for bridge reconstruction or construction (as part of large road investments) within the last three years, with specific minimum values per task (PLN 120,000 for Task 1, PLN 100,000 for Tasks 2 and 3)
- For Task 1: One designer and one checker with higher education, unlimited bridge engineering design qualifications, and minimum five years of experience post-qualification
- For Tasks 2 and 3: One designer and one checker with the same qualifications and experience as Task 1
- For multiple tasks: Minimum four qualified persons (two designers and two checkers) with no role overlap
What to submit
- Offer form (Załącznik nr 2.1, 2.2, 2.3)
- Document confirming representation authority
- Consolidated billing element statement (Załącznik nr 2A, 2B, 2C)
- Statements on exclusion and eligibility (Załącznik nr 3 and 4)
- Commitment of resource-sharing entity (if applicable, Załącznik nr 6)
- Consortium statement (if applicable, Załącznik nr 5)
- Proof of designer’s bridge engineering experience (Załącznik nr 1A)
- List of services performed (Załącznik nr 7)
- List of persons assigned to the project (Załącznik nr 8)
Award criteria
- Price (60% weight)
- Experience of personnel assigned to the project (40% weight)
Source
Published on e-Zamowienia. Original title: OPRACOWANIE DOKUMENTACJI PROJEKTOWEJ DLA ROZBIÓRKI I BUDOWY 3 OBIEKTÓW MOSTOWYCH Z PODZIAŁEM NA 3 ZADANIA: ZADANIE 1:(...) M. PRUCHNA ZADANIE 2:(...) M. HAŻLACH ZADANIE 3:(...) M. KOŃCZYCE WIELKIE.
Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 29 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.