About the project

Preparation of design and cost documentation for the construction of three streets in Konin, including building permits, traffic organization, drainage systems, and updates to existing lighting designs. The project covers roadworks, sidewalks, and necessary legal approvals for the investment.

Scope of work

Preparation of full design documentation for the construction of Grabowa, Jarzębinowa, and Topolowa streets, including building permits, traffic organization, drainage systems, and updates to existing street lighting designs. The project requires compliance with accessibility standards and obtaining a Decision on Permit for Road Investment Implementation (ZRID).

Deliverables

  • Building design (5 copies)
  • Execution design (5 copies)
  • Permanent traffic organization design (4 copies)
  • Bill of quantities (3 copies)
  • Investor cost estimate (3 copies)
  • Technical specifications for construction and acceptance (2 copies)
  • Required legal decisions, permits, and opinions
  • Application for ZRID with necessary documents
  • Stormwater drainage design
  • Updated street lighting design

Required services

  • engineering design services
  • road design
  • traffic organization design
  • drainage system design
  • cost estimation
  • legal and permitting support

Pelenoir assessment

This project primarily involves engineering and technical planning for the design and documentation of urban road infrastructure, including drainage, traffic organization, and lighting updates. Secondary support is required for project management tasks related to legal permitting and compliance.

  • Design of roadworks, drainage systems, traffic organization, and updates to street lighting infrastructure for the construction of Grabowa, Jarzębinowa, and Topolowa streets.

  • Support for obtaining legal permits, including the Decision on Permit for Road Investment Implementation (ZRID), and coordination of documentation for compliance with accessibility standards.

How to take part

Who can apply

  • Contractor must employ a road design engineer with at least 5 years of unrestricted design qualifications and experience in obtaining ZRID for road projects
  • Contractor must employ a verifying road design engineer with at least 5 years of unrestricted design qualifications
  • Foreign qualifications recognized under EU/EFTA/Swiss regulations are accepted

What to submit

  • Offer form (Załącznik nr 1 do SWZ)
  • Statement confirming eligibility and no exclusion grounds (Załącznik nr 2 do SWZ)
  • Statement for third-party entities (Załącznik nr 3 do SWZ, if applicable)
  • Task division statement for joint bidders (Załącznik nr 4 do SWZ, if applicable)
  • Priced bid form (Załącznik nr 5 do SWZ)
  • Commitment to provide resources (if applicable)
  • Power of attorney or representation documents (if applicable)

Award criteria

  • Price (60% weight)
  • Experience of the road design engineer (40% weight)

Source

Published on e-Zamowienia. Original title: „Opracowanie dokumentacji projektowej na budowę ulic Grabowej, Jarzębinowej i Topolowej w Koninie”.

Summary and assessment prepared by Pelenoir from the public notice (6 Nov 2026). The original notice and its documents are binding. Page updated 5 Nov 2026.