About the project

Preparation of complete design documentation for the construction of Ks. Hładuniaka, Chabrowa, Norwida, and Polna streets in Dęblin, including road structures, drainage systems, lighting, traffic organization, and obtaining all necessary permits under the Polish Special Road Investment Act.

Scope of work

Preparation of complete design documentation for four streets in Dęblin, including conceptual design, construction drawings, technical specifications, cost estimates, traffic organization, and obtaining a decision on permission for road investment (ZRID) under the Polish Special Road Investment Act.

Deliverables

  • Concept for land development (1 copy)
  • Survey maps and geodetic measurements
  • Materials for application for ZRID decision (4 copies)
  • Complete construction project (4 copies)
  • Technical specifications for execution and acceptance of construction works (3 copies)
  • Bill of quantities (2 copies)
  • Investor cost estimate (2 copies)
  • Permanent traffic organization project with required approvals (4 copies)
  • Obtaining all necessary technical conditions, permits, and decisions
  • Complete application for ZRID decision (2 sets)
  • Obtaining ZRID decision

Required services

  • Civil engineering design
  • Road design
  • Drainage system design
  • Road lighting design
  • Traffic organization design
  • Geodetic surveying
  • Cost estimation
  • Permit and decision acquisition

Pelenoir assessment

This project primarily involves the design and technical planning of urban road infrastructure, including roads, drainage, lighting, and traffic organization. Secondary disciplines include geodetic surveying to support the design process and project management for permit acquisition under Polish road investment regulations.

  • Design of road structures, drainage systems, road lighting, and traffic organization for the four streets in Dęblin, including technical specifications and cost estimates.

  • Surveying 15%

    Provision of survey maps, geodetic measurements, and geospatial data required for the design and permitting process.

  • Coordination of permit acquisition, including the ZRID decision under the Polish Special Road Investment Act, and preparation of application materials.

How to take part

Who can apply

  • Experience in preparing design documentation for road construction serving ZRID decisions in the last 3 years
  • Availability of a road design engineer with unlimited civil engineering design qualifications and experience in at least one ZRID-related project in the last 5 years
  • Polish language proficiency or provision of a translator

What to submit

  • Completed offer form (Załącznik nr 1)
  • Documents confirming representation authority
  • Declaration under art. 125 ust. 1 of the Public Procurement Law (Załącznik nr 2)
  • List of completed services (Załącznik nr 6)
  • List of personnel with qualifications and experience (Załącznik nr 7)
  • Commitment of resource-sharing entities (if applicable, Załącznik nr 5)
  • Declaration of joint bidders (if applicable, Załącznik nr 4)

Award criteria

  • Price (60%)
  • Experience of the road design engineer (40%)

Tender documents

The visible document package includes the tender specifications (SWZ.pdf), offer forms (Załącznik nr 1), declarations required under Polish Public Procurement Law (Załączniki nr 2–5), lists of completed services and personnel (Załączniki nr 6–7), and a contract template (Załącznik nr 8). The files likely contain detailed instructions for submission, legal declarations, and templates for documenting experience and qualifications. The SWZ file is expected to provide comprehensive tender conditions, while the contract template outlines terms and conditions. No technical drawings or maps are visible in the file names, and the exact content of the forms and declarations remains unknown without access to the files.

Source

Published on e-Zamowienia. Original title: Opracowanie kompletnej dokumentacji projektowej na budowę ulic Ks. Hładuniaka, Chabrowej, Norwida i Polnej w Dęblinie.

Summary and assessment prepared by Pelenoir from the public notice (16 Oct 2026). The original notice and its documents are binding. Page updated 15 Oct 2026.