Project and construction management · Service contract
Czechowice-Dziedzice Sustainable Stormwater Management Development
Implementation of multi-disciplinary investor supervision for the development of sustainable stormwater management systems in Czechowice-Dziedzice, including green and blue infrastructure across three specific sites: along Niepodległości Street, Słowackiego…
- Deadline
- Closed 24 days ago
- Location
- Czechowice-Dziedzice, Śląskie, Poland
About the project
Implementation of multi-disciplinary investor supervision for the development of sustainable stormwater management systems in Czechowice-Dziedzice, including green and blue infrastructure across three specific sites: along Niepodległości Street, Słowackiego and Niepodległości Streets, and Legionów Street. The supervision covers coordination, management, control, and settlement of design and construction works during implementation and warranty periods.
Scope of work
Provision of multi-disciplinary investor supervision services for the implementation of sustainable stormwater management systems, including coordination, control, and settlement of design and construction works for three specific sites. The supervision extends through the construction period and warranty periods for defects and quality guarantees.
Deliverables
- Multi-disciplinary investor supervision services
- Coordination and management of design and construction works
- Control and settlement of construction and demolition works
- Supervision during warranty and defect liability periods
Required services
- Construction supervision (multi-disciplinary)
- Coordination of inspection teams
- Contract management (Engineer role)
- Technical and professional oversight for green infrastructure, demolition, and landscaping
Pelenoir assessment
This project focuses on the development of sustainable stormwater management systems through green and blue infrastructure, requiring multi-disciplinary investor supervision as the primary scope. The supervision covers coordination, control, and settlement of design and construction works, with a significant emphasis on landscape architecture and technical engineering oversight for structural, sanitary, and electrical disciplines.
-
Multi-disciplinary investor supervision, coordination and management of design and construction works, control and settlement of construction activities, and oversight during warranty and defect liability periods for sustainable stormwater management systems.
-
Technical and professional oversight for green infrastructure development, including landscape design, planting, and outdoor environmental integration within the stormwater management systems.
-
Engineering 10%
Technical oversight for structural, sanitary, and electrical disciplines, as well as coordination of demolition works and stormwater management infrastructure.
How to take part
Who can apply
- Experience in supervising at least one construction project involving green space development (≥500 m²) or demolition of buildings (≥1000 m³)
- Personnel with valid construction supervision licenses in structural, electrical, and sanitary disciplines, and landscape architecture or horticulture qualifications
- Compliance with Polish Public Procurement Law (Pzp) exclusion and qualification requirements
What to submit
- Electronic offer using qualified, trusted, or personal signature
- Offer form (Załącznik nr 1 do SWZ)
- Statement on exclusion and qualification (Załącznik nr 3 do SWZ)
- Price form (Załącznik nr 2 do SWZ)
- Power of attorney (if applicable)
- Commitment from resource-sharing entities (Załącznik nr 5 do SWZ)
- Statement under art. 117 Pzp (Załącznik nr 6 do SWZ)
- Documents in Polish language only
- Submission via designated e-procurement platform
Award criteria
- Price (60%)
- Response time (40%)
Source
Published on e-Zamowienia. Original title: Sprawowanie wielobranżowego nadzoru inwestorskiego nad realizacją zadania:„Zielono-niebieska Gmina Czechowice-Dziedzice – rozwój zrównoważonych systemów gospodarowania wodami opadowymi”.
Summary and assessment prepared by Pelenoir from the public notice (26 Oct 2026). The original notice and its documents are binding. Page updated 23 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.