About the project

Supervision of construction works for the energy efficiency improvement and refurbishment of the historic town hall building in Reszel, including thermal insulation, installation upgrades (heating, ventilation, plumbing, electrical) and conservation-compliant interventions.

Scope of work

Supervision of construction works for the energy efficiency retrofit and refurbishment of the historic town hall in Reszel, covering thermal insulation, HVAC, plumbing, electrical and conservation-compliant interventions. The inspector must ensure compliance with project documentation, building codes and conservation requirements throughout the 16-month contract, including warranty periods.

Deliverables

  • Supervision of construction works as defined in the Polish Construction Law (art. 25–27)
  • Compliance verification with project documentation, building codes and conservation requirements
  • Final acceptance of completed works

Required services

Pelenoir assessment

This project is classified under PROJECT_AND_CONSTRUCTION_MANAGEMENT as its scope is exclusively focused on the supervision and management of construction works for the energy efficiency retrofit and refurbishment of a historic town hall. No architectural design, engineering, or other AEC disciplines are directly procured or supported by the extracted facts.

  • Supervision of construction works for the energy efficiency retrofit and refurbishment of the historic town hall, ensuring compliance with project documentation, building codes, and conservation requirements throughout the contract period, including warranty periods.

How to take part

Who can apply

  • Minimum one completed supervision contract for a heritage building retrofit or refurbishment worth at least PLN 1,000,000 gross in the past 5 years
  • Team must include certified inspectors for structural, HVAC, electrical and conservation works as specified in the tender

What to submit

  • Offer in Polish
  • Completed submission forms from the tender documentation (SWZ)
  • Proof of experience and qualifications for the required inspector roles

Award criteria

  • Price (60% weight)
  • Start date for supervision activities (40% weight)

Tender documents

The visible ZIP file, titled 'SWZ z załącznikami.zip', likely contains the full tender documentation package. This probably includes the Specification of Essential Terms (SWZ), which outlines the contract conditions, scope of work, eligibility criteria and submission requirements. Based on the tender context, the package is also expected to include technical drawings and project documentation for the town hall retrofit, as well as standard submission forms for offers, experience declarations and inspector qualifications. The exact contents of the ZIP cannot be confirmed without downloading, but the filenames and tender references strongly suggest these components.

Source

Published on e-Zamowienia. Original title: Pełnienie funkcji inspektora nadzoru inwestorskiego nad realizacją zadania inwestycyjnego pn.: ,,Poprawa efektywności energetycznej budynku Ratusza w Reszlu wraz z przebudową”.

Summary and assessment prepared by Pelenoir from the public notice (24 Nov 2026). The original notice and its documents are binding. Page updated 23 Nov 2026.