Engineering · Service contract
CTD Railway Connection General Planner
General planning services for the construction and phased commissioning of a new railway connection (Anschlussbahn) to the Cargo-Terminal Development (CTD) site, planned from 2027 to 2032.
- Deadline
- Closed 16 days ago
- Location
- Werndorf, Styria, Austria
About the project
General planning services for the construction and phased commissioning of a new railway connection (Anschlussbahn) to the Cargo-Terminal Development (CTD) site, planned from 2027 to 2032.
Scope of work
General planning services for the new CTD railway connection, including design, construction phases, and commissioning up to 2032. The contract is structured as a framework agreement with a single company.
Deliverables
- General planning services for railway infrastructure
- Phased construction and commissioning plans
Required services
- Architecture services
- Engineering services
- Technical planning and design
- Project management
Pelenoir assessment
The CTD Railway Connection General Planner project primarily involves engineering and technical planning for railway infrastructure, with secondary scope for project management and limited architectural design. The focus is on delivering a new freight terminal connection through structured planning, technical engineering, and phased construction oversight.
-
Engineering 60%
Structural, civil, and technical engineering for the design and construction of the new railway connection, including track infrastructure, signaling, and integration with the existing freight terminal.
-
Project management, coordination of construction phases, commissioning, and client representation for the railway connection project, ensuring timely delivery and adherence to technical specifications.
-
Architecture 10%
Architectural design and conceptual planning for ancillary structures, such as stations, shelters, or operational buildings associated with the railway connection.
How to take part
Who can apply
- Open to small and medium-sized enterprises (KMU)
- Multi-phase procedure with selection of up to 3 bidders for the second phase
- Required professional qualifications for personnel
What to submit
- Participation applications in German
- Electronic submission required
- Names and professional qualifications of personnel to be specified
Award criteria
- Quality (60%): concept, presentation, response time, environmental sustainability
- Price (40%): total price
Source
Published on Austrian Public Procurement Search. Original title: Generalplaner Anschlussbahn CTD.
Summary and assessment prepared by Pelenoir from the public notice (30 Oct 2026). The original notice and its documents are binding. Page updated 27 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.