Engineering · Service contract
Construction of two water retention reservoirs in Ożarów Mazowiecki Municipality
Design documentation for two reinforced concrete water retention reservoirs (500 m³ each) with pump stations and associated infrastructure in Jawczyce and Duchnice, including demolition of existing buildings, obtaining building permits, and preparing…
- Deadline
- Closed 8 days ago
- Location
- Ożarów Mazowiecki, Mazowieckie, Poland
- Declared value
- PLN 904 610 (≈ EUR 202 832)
About the project
Design documentation for two reinforced concrete water retention reservoirs (500 m³ each) with pump stations and associated infrastructure in Jawczyce and Duchnice, including demolition of existing buildings, obtaining building permits, and preparing technical, architectural, and cost documentation for future construction tenders.
Scope of work
Design documentation for two water retention reservoirs (500 m³ each) in Jawczyce and Duchnice, including demolition of existing buildings, construction of reinforced concrete reservoirs, pump stations, and associated infrastructure. The scope covers architectural, structural, electrical, technological, and cost documentation, as well as obtaining building permits and providing electronic and paper copies of all deliverables.
Deliverables
- building design documentation (3 paper copies + electronic versions)
- site development plans (3 paper copies + electronic versions)
- energy supply design with connection conditions (3 paper copies + electronic versions)
- technical designs for architectural, electrical, structural, and technological branches (3 paper copies + electronic versions)
- Technical Specifications for Construction Works Execution and Acceptance (STWiORB) (3 paper copies + electronic versions)
- bill of quantities (pdf and ath formats)
- investment cost estimates (pdf and ath formats)
- 10 visualizations per reservoir
- electronic versions on pendrive (pdf, word, dwg, xls, CAD formats)
- anonymized electronic files
- building permit documentation
- preliminary project concept (within 30 days of contract signing)
- monthly progress reports (by the 25th of each month)
Required services
- architectural design
- structural engineering
- electrical and automation design
- technological design for water infrastructure
- cost estimation and quantity surveying
- obtaining building permits
- author supervision during construction (if required)
Pelenoir assessment
This project primarily involves the engineering and technical planning of two water retention reservoirs, including structural, civil, and technical design. Secondary disciplines include architectural design for the reservoirs and pump stations, as well as project and construction management for cost estimation, permitting, and documentation preparation.
-
Engineering 60%
Structural, civil, and technical engineering for the design of two reinforced concrete water retention reservoirs (500 m³ each), including pump stations, electrical and automation systems, and associated infrastructure.
-
Architecture 20%
Architectural design of the reservoirs, pump stations, and site development plans, including building permit documentation and visualizations.
-
Cost estimation, quantity surveying, obtaining building permits, and preparing documentation for future construction tenders.
How to take part
Who can apply
- minimum 30,000 PLN financial capacity per lot
- experience in designing reinforced concrete liquid retention reservoirs (≥300 m³) within the last 3 years
- qualified personnel: structural engineer (unlimited license) and sanitary engineer (unlimited license) with experience in designing liquid retention reservoirs (≥300 m³)
- consortium members may combine experience and qualifications
What to submit
- offers submitted electronically via the e-Zamówienia Platform
- documents in Polish
- electronic formats compliant with Polish interoperability standards (pdf, doc, xls, dwg, CAD, ath)
- original documents for official submissions (e.g., permits, approvals)
- bid bond: 3,000 PLN per lot (cash, bank guarantee, or insurance guarantee)
- cybersecurity compliance declaration (Załącznik nr 6)
- power of attorney (if applicable)
- consortium agreement (if applicable)
Award criteria
- Price (60%)
- Additional experience of the designated project personnel (40%)
Tender documents
The visible document package consists of a single ZIP file titled 'SWZ i załączniki.zip.' Based on the tender context, this package likely contains the full Specyfikacja Warunków Zamówienia (SWZ), which includes detailed contract terms, technical requirements, submission forms, and annexes such as cybersecurity compliance templates. The ZIP may also include sample forms for bid bonds, power of attorney, and consortium agreements. However, the exact contents of the ZIP cannot be confirmed without access, and no specific drawings, plans, or cost estimates are visibly listed in the tender context beyond the ZIP file name.
Source
Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej cz.: cz. A - Projekt budowy zbiornika retencyjnego wody uzdatnionej w Jawczycach, cz. B - Projekt budowy zbiornika retencyjnego wody uzdatnionej w Duchnicach.
Summary and assessment prepared by Pelenoir from the public notice (11 Nov 2026). The original notice and its documents are binding. Page updated 10 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.