About the project

Design and construction of 69 domestic biological wastewater treatment plants (PBOŚ) in Podegrodzie Municipality under a design-build contract. The project includes design, supply, installation, and commissioning of the plants, compliant with PN-EN 12566-31-A2:2013-10 standards. The works must ensure accessibility for disabled persons and universal design principles.

Scope of work

Design, supply, installation, and commissioning of 69 domestic biological wastewater treatment plants (PBOŚ) in Podegrodzie Municipality. The works must comply with PN-EN 12566-31-A2:2013-10 standards, ensure accessibility for disabled persons, and include all necessary construction, electrical, and piping works. The contractor must also provide required documentation for operational approval.

Deliverables

  • 69 domestic biological wastewater treatment plants (PBOŚ)
  • Design documentation for the plants
  • Construction and installation works
  • Electrical and piping installations
  • Commissioning and operational documentation

Required services

  • engineering design services (CPV 71320000-7)
  • construction works (CPV 45000000-7)
  • site preparation and earthworks (CPV 45111200-0)
  • wastewater treatment plant construction (CPV 45232421-9)
  • sewerage system construction (CPV 45232410-9)
  • electrical installation works (CPV 45310000-3)

Pelenoir assessment

This project primarily involves the design and construction of domestic wastewater treatment plants under a design-build contract. The scope is dominated by engineering and technical planning for compliance with standards and accessibility, alongside physical construction and installation works.

  • Design of 69 domestic biological wastewater treatment plants, including structural, civil, and technical engineering to comply with PN-EN 12566-31-A2:2013-10 standards, accessibility requirements, and integration of electrical and piping systems.

  • Physical construction, installation, and commissioning of 69 domestic wastewater treatment plants, including site preparation, earthworks, electrical and piping installations, and operational documentation.

How to take part

Who can apply

  • Contractor must demonstrate experience in constructing domestic wastewater treatment plants worth at least PLN 500,000 gross in the last 5 years
  • Contractor must employ personnel with appropriate design and construction licenses for water, sewage, and electrical installations
  • Contractor must comply with Polish Public Procurement Law (Pzp) and GDPR requirements

What to submit

  • Completed offer form (Załącznik nr 1)
  • Statement on meeting participation conditions and absence of exclusion grounds (Załącznik nr 2)
  • Documentation proving technical and professional capacity (Załączniki nr 5, 6, 7)
  • Bid bond of PLN 15,000 in one of the accepted forms (cash, bank guarantee, insurance guarantee, or surety)
  • Electronic submission in Polish, signed with a qualified electronic signature

Award criteria

  • Price – 60% weight
  • Warranty and guarantee period (in months) – 40% weight

Tender documents

The visible document package includes eight files: a Word document detailing the budget allocation, a Specification of Essential Terms (SWZ) in DOCX format, multiple annexes containing submission forms (Załącznik nr 1, 2, 3, 4), qualification documents (Załącznik nr 5, 6, 7), a draft contract (Załącznik nr 8), and a Functional and User Program (PFU) in PDF format (Załącznik nr 9). The PFU likely outlines the technical and functional requirements for the wastewater treatment plants. The annexes probably include templates for offers, statements, and supporting documents required for submission. The draft contract may detail the terms, conditions, and legal framework for the project execution. The exact content of these files cannot be confirmed without access, but their titles suggest they cover all aspects of the tender process.

Source

Published on e-Zamowienia. Original title: „Budowa przydomowych oczyszczalni ścieków w Gminie Podegrodzie (w systemie zaprojektuj i wybuduj)”.

Summary and assessment prepared by Pelenoir from the public notice (30 Oct 2026). The original notice and its documents are binding. Page updated 30 Oct 2026.