Tenders of Europe project card: Comprehensive renovation of 1980s educational and cultural building in Rauma, Rauma, Finland
Featured in the daily edition, 13 Nov 2026

About the project

Renovation of an 80-year-old, three-storey, yellow-brick building of approximately 10,600 m², currently used by Satakunta University of Applied Sciences and the City of Rauma. The project includes structural, HVAC, electrical, building automation design, and BIM coordination. The building houses educational facilities, a 400-seat concert hall (Rauma-sali), and a gymnasium, which may be demolished pending further design assessments. The renovation will adapt spaces for secondary education, including teaching kitchens and other educational areas. The concert hall's future use will be clarified during the design phase.

Why it matters

Renovating an 80-year-old educational building in Rauma means turning BIM coordination into the quiet backbone of daily use.

Scope of work

Design services for the comprehensive renovation of an educational and cultural building, including structural, HVAC, electrical, building automation design, and BIM coordination. The selected designers must be available throughout the design and construction phases, participate in meetings, and support the project until completion and operational inspections. The project follows the general BIM requirements YTV 2012, accuracy level 2. Architectural design and lifecycle expertise will be procured through a mini-competition among framework agreement partners. AV and acoustics design will be ordered from framework partners under framework agreement terms.

Deliverables

  • structural design
  • HVAC design
  • electrical design
  • building automation design
  • BIM coordination
  • participation in design meetings (remote and on-site)
  • support during tendering and construction phases
  • operational inspection participation

Required services

  • structural engineering
  • HVAC engineering
  • electrical engineering
  • building automation engineering
  • BIM coordination
  • architectural design (via mini-competition)
  • lifecycle expertise (via mini-competition)

Pelenoir assessment

The project is a comprehensive renovation of an 80-year-old educational and cultural building, primarily focused on architectural design and engineering disciplines. The scope includes architectural adaptation of spaces for secondary education, as well as structural, HVAC, electrical, and building automation engineering. BIM coordination is also a key component, ensuring digital integration of all design disciplines. The project does not explicitly support urban planning, landscape, interior design, or construction contracting within the extracted facts.

  • Architectural design for the comprehensive renovation of the educational and cultural building, including space adaptation for secondary education, teaching kitchens, and potential reconfiguration of the concert hall and gymnasium. The focus includes conceptual and detailed design to align with the building's new functional requirements.

  • Structural, HVAC, electrical, and building automation engineering design for the renovation. This includes ensuring the building's systems are updated to modern standards and integrated with the architectural design.

  • BIM coordination and digital model management for the renovation project, ensuring compliance with YTV 2012 accuracy level 2 requirements. This includes integrating architectural, structural, and MEP designs into a unified digital model.

How to take part

Who can apply

  • open to all qualified tenderers under Finnish public procurement law
  • SME participation considered
  • no reserved procurement

What to submit

  • tender documents in Finnish
  • curricula as required
  • electronic submission via specified platform

Award criteria

  • comparative price (vertailuhinta) formed by total design price, remote meeting fees, on-site meeting fees, and hourly rates for additional work

Source

Published on HILMA. Original title: Satamakatu 26 peruskorjauksen suunnittelu.

Summary and assessment prepared by Pelenoir from the public notice (13 Nov 2026). The original notice and its documents are binding. Page updated 13 Nov 2026.