About the project

Construction of a biomass heating plant with general contractor services for mechanical engineering and plant technology in Wörgl, Austria.

Scope of work

General contractor services for mechanical engineering and plant technology for a biomass heating plant, including machine installations and sanitary equipment installation.

Deliverables

  • mechanical engineering installations
  • sanitary equipment installations

Required services

  • general contracting for plant technology

Pelenoir assessment

This project focuses on the engineering, technical planning, and construction of a biomass heating plant, with a primary emphasis on mechanical and plant technology engineering. General contracting for installation is a secondary but necessary component of the scope.

  • Design, planning, and technical engineering of mechanical systems and plant technology for the biomass heating plant, including structural and building-services engineering.

  • Physical construction, installation, and general contracting for the biomass heating plant's mechanical and sanitary systems.

How to take part

Who can apply

  • Compliance with Austrian public procurement law (BVergG 2018 § 21 Abs 1)
  • Suitability for small and medium-sized enterprises (KMU)
  • Maximum of 7 bidders invited to the second phase
  • Bidders must form a solidarisch haftenden Arbeitsgemeinschaft (ARGE) if awarded

What to submit

  • Submission in German
  • Electronic submission required
  • See tender documents for detailed conditions

Award criteria

  • Quality (weight: 10 points)
  • Price (weight: 90 points)

Source

Published on Austrian Public Procurement Search. Original title: Wörgl Wärme GmbH - Generalunternehmer Anlagentechnik – Biomasseheizwerk Wörgl West.

Summary and assessment prepared by Pelenoir from the public notice (17 Oct 2026). The original notice and its documents are binding. Page updated 14 Oct 2026.