About the project

Development of comprehensive design and cost documentation for the construction of a retention reservoir with a dry polder in Bieruń, including hydrological-hydraulic analysis, conceptual design variants, multi-disciplinary construction documentation, and obtaining necessary permits for flood protection and rainwater retention on post-mining land.

Scope of work

Development of design and cost documentation for a retention reservoir with a dry polder, including hydrological-hydraulic analysis, two conceptual design variants, multi-disciplinary construction documentation, obtaining permits, and optional author supervision during construction.

Deliverables

  • Hydrological-hydraulic analysis with land development directions
  • Two conceptual design variants for the retention reservoir with dry polder
  • Multi-disciplinary design and cost documentation for the reservoir construction
  • Necessary opinions, agreements, permits, and decisions for construction execution
  • Final building permit decision
  • Optional: Author supervision during construction (right of option)

Required services

  • Architectural and engineering design services
  • Civil and water engineering design services
  • Project preparation and cost estimation
  • Approval plans, working drawings, and specifications
  • Project and documentation supervision

Pelenoir assessment

The project primarily involves engineering and technical planning for the design and permitting of a flood protection and rainwater retention reservoir, including hydrotechnical infrastructure. Secondary urban design and planning work is required to integrate the reservoir into the existing land development context.

  • Development of hydrological-hydraulic analysis, structural and technical design for the retention reservoir with dry polder, including civil and water engineering solutions, multi-disciplinary construction documentation, and obtaining necessary permits for flood protection and rainwater retention.

  • Integration of the retention reservoir into the existing land development directions, spatial planning for flood protection, and coordination with urban infrastructure in Bieruń.

How to take part

Who can apply

  • Contractor must have at least one person with unlimited hydrotechnical engineering design qualifications
  • Contractor must demonstrate experience in designing retention reservoirs with a capacity of at least 5,000 m³, including obtaining a final building permit or investment realization permit for flood control structures within the last three years

What to submit

  • Offers and documents must be submitted electronically via the Polish Procurement Platform (platformazakupowa.pl)
  • Documents must be prepared in Polish
  • Submission of required declarations and proofs of eligibility as specified in the Terms of Reference (SWZ)

Award criteria

  • Price (60% weight)
  • Designer experience (30% weight)
  • Documentation correction timeline (10% weight)

Source

Published on e-Zamowienia. Original title: Budowa zbiornika w Bieruniu w rejonie terenów inwestycyjnych przy ul. Ekonomicznej (dokumentacja).