Architecture · Service contract
Bicycle path along national road 57 in Biskupiec
A bicycle path’s accessibility compliance turns a linear route into a daily contract with its users.
- Deadline
- Closed 9 days ago
- Location
- Biskupiec, Warmian-Masurian, Poland
- Declared value
- PLN 229 000 (≈ EUR 51 346)
About the project
Preparation of complete design documentation for the construction of a bicycle path along national road 57, from the intersection of Niepodległości and Kościuszki streets to Czerwonka. The design must comply with accessibility requirements for people with disabilities and universal design principles.
Why it matters
Accessibility compliance (art. 100 ustawy pzp) turns a bicycle path into a daily contract with its users, setting constraints before design begins.
The tender for a bicycle path along national road 57 in Biskupiec specifies that documentation must comply with art. 100 of Poland’s Public Procurement Law, making accessibility a mandatory requirement.
This reveals how landscape architecture briefs often embed legal constraints as the first layer of design, turning compliance into a daily contract with users before the first sketch is drawn.
Scope of work
Preparation of complete design documentation for a bicycle path along national road 57, including compliance with accessibility standards and universal design. The documentation must be based on the provided concept and terms of reference (OPZ). The project includes coordination with the General Directorate for National Roads and Motorways (GDDKiA).
Deliverables
- complete design documentation for bicycle path construction
- documentation compliant with accessibility requirements (art. 100 ustawy pzp)
Required services
- architectural design services (CPV 71220000-6)
- engineering design for road infrastructure
Pelenoir assessment
This project primarily involves the preparation of design documentation for a bicycle path, combining architectural design (with a focus on accessibility and universal design) and engineering planning for road infrastructure integration. The scope explicitly supports both ARCHITECTURE_AND_DESIGN and ENGINEERING_AND_TECHNICAL_PLANNING disciplines.
-
Architecture 60%
Preparation of architectural design documentation for the bicycle path, including compliance with accessibility standards and universal design principles, as well as coordination with road infrastructure requirements.
-
Engineering 40%
Engineering design for the bicycle path, including structural and technical coordination with the adjacent national road 57 and integration with existing infrastructure.
How to take part
Who can apply
- Contractor must designate a person with road engineering design qualifications (unrestricted or limited) under Polish construction law
- Contractor must submit a statement of non-exclusion under art. 125 ust. 1 ustawy pzp and art. 7 ust. 1 of the Act on special solutions for counteracting support for aggression against Ukraine
What to submit
- Completed and signed offer form (załącznik nr 1 do SWZ)
- Statement of non-exclusion (art. 125 ust. 1 ustawy pzp)
- Power of attorney (if applicable)
- Bid bond of 3,000 PLN (wadium)
Award criteria
- Price (60% weight)
- Qualifications and experience of the designated person (40% weight): 0-1 completed design documentations (2022-2026) – 0 points, 2-3 documentations – 20 points, 4+ documentations – 40 points
Tender documents
The visible document package includes three files: one PDF titled '01 ogłoszenie o zamówieniu.pdf' likely containing the official tender notice and procedural details. Two ZIP archives are present: 'Opis zakresu, koncepcja Kś.zip' probably contains the project scope description, concept, and terms of reference (OPZ) for the bicycle path design. The second ZIP, 'SWZ i załączniki (f.oferty, ośw., wzór umowy) Kś.zip', likely includes the tender specifications (SWZ), offer form templates, non-exclusion statements, and a draft contract. The exact contents of the ZIP files cannot be confirmed without access, but their filenames suggest standard procurement documentation and design briefs.
Source
Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowej - budowa ścieżki rowerowej wzdłuż drogi krajowej 57 od skrzyżowania ul. Niepodległości z ul. Kościuszki do Czerwonki..
Summary and assessment prepared by Pelenoir from the public notice (10 Nov 2026). The original notice and its documents are binding. Page updated 10 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
