About the project

Design and construction documentation for a bicycle and pedestrian path with lighting and traffic signals along national road 60, including architectural and engineering design, preparation of materials for the ZRID decision, execution project, tender materials, and author supervision.

Scope of work

Development of construction design with materials for obtaining the ZRID decision, execution project, tender materials, and author supervision for two sections of a bicycle and pedestrian path along national road 60, including lighting and traffic signals at intersections.

Deliverables

  • Construction design with materials for ZRID decision
  • Execution project
  • Tender materials
  • Author supervision

Required services

Pelenoir assessment

This project primarily involves engineering and technical planning for a bicycle and pedestrian path, including road and traffic infrastructure design. Architectural design is also required for the path's integration with its surroundings, while project and construction management is needed for author supervision during execution.

  • Design of the bicycle and pedestrian path structure, road engineering, traffic signals, lighting infrastructure, and civil engineering works required for the path and intersections along national road 60.

  • Architectural design of the bicycle and pedestrian path, including integration with the surrounding environment, urban context, and design of intersections with traffic signals.

  • Author supervision during the construction phase to ensure compliance with the design and project specifications.

How to take part

Who can apply

  • Execution of at least one similar design documentation project in the last 3 years, approved by a ZRID decision, with a minimum value of PLN 100,000
  • At least one person with unlimited design qualifications in road engineering
  • At least one person with unlimited design qualifications in electrical and telecommunication engineering
  • At least one person with unlimited design qualifications in gas, water supply, and sewage engineering

What to submit

  • Offer form (Załącznik nr 3 do SWZ)
  • Statement on non-exclusion (Załącznik nr 4 do SWZ)
  • Statement on meeting participation conditions (Załącznik nr 5 do SWZ)
  • Bid bond for each part of the contract
  • Power of attorney (if applicable)
  • Commitment of resource-sharing entities (Załącznik nr 6 do SWZ)
  • Statement for joint bidders (Załącznik nr 7 do SWZ)

Award criteria

  • Price (60%)
  • Guarantee (40%)

Tender documents

The visible document package includes a PDF file labeled 'SWZ projekt ścieżka Sierakówek.pdf,' which likely contains the detailed specification of contract conditions (SWZ) for the design and execution project. Two ZIP archives are present: 'Załącznik nr 9 Wytyczne.zip' probably contains technical guidelines or standards for the project, while 'Załączniki do SWZ od nr 1 do nr 8.zip' likely includes annexes such as forms, templates, and additional contractual or technical documents. The exact contents of the ZIP files cannot be confirmed without access, but their names suggest they contain supporting materials for submission and project execution.

Source

Published on e-Zamowienia. Original title: Opracowanie projektu budowlanego wraz z materiałami do uzyskania decyzji ZRID, projektu wykonawczego, materiałów przetargowych oraz pełnienie nadzoru autorskiego dla zadania ....

Summary and assessment prepared by Pelenoir from the public notice (20 Oct 2026). The original notice and its documents are binding. Page updated 19 Oct 2026.