Engineering · Service contract
Autonomous water intake and treatment station for military hospital in Żary
Development of concept, building permit design and technical design for an autonomous water intake with a water treatment station, hydrophore station and water reservoir for the 105th Kresowy Military Hospital in Żary.
- Deadline
- Closed 26 days ago
- Location
- Żary, Lubuskie, Poland
About the project
Development of concept, building permit design and technical design for an autonomous water intake with a water treatment station, hydrophore station and water reservoir for the 105th Kresowy Military Hospital in Żary. The project includes modernization of an existing groundwater intake in Kadłubia, construction of a fully automated water treatment station, hydrophore station, water retention system, hospital water supply installation and connection to the municipal water supply network.
Scope of work
Development of concept design, building permit design and technical design for an autonomous water intake system, including a water treatment station with aeration, filtration and disinfection processes, a hydrophore station, a water retention system, and connection to the hospital's water supply network and municipal water supply. The project includes an optional 36-month post-delivery design support service.
Deliverables
- concept design for water intake and treatment station
- building permit design for water intake and treatment station
- technical design for water intake and treatment station
- design for hydrophore station and water retention system
- design for hospital water supply installation
- design for connection to municipal water supply network
Required services
- engineering design services for water treatment
- architectural design services for water infrastructure
- civil and water engineering design services
- project preparation and cost estimation
Pelenoir assessment
This project is primarily an engineering and technical planning endeavor focused on the design of an autonomous water intake and treatment system for a military hospital. The scope includes significant civil, sanitary, and electrical engineering work for water treatment processes, as well as architectural design for the infrastructure's building permit and technical integration. Project management activities, such as cost estimation and design coordination, are also required but represent a smaller share of the scope.
-
Engineering 70%
Design of the autonomous water intake system, including structural and technical engineering for the water treatment station, hydrophore station, water retention system, and integration with the hospital's water supply network and municipal water supply. This includes civil, sanitary, electrical, and automation engineering for water treatment processes such as aeration, filtration, and disinfection.
-
Architecture 20%
Architectural design of the water treatment station, hydrophore station, and associated infrastructure to ensure functional integration with the site, compliance with building regulations, and aesthetic coherence with the hospital environment.
-
Project preparation, cost estimation, and coordination of the design process, including alignment with regulatory requirements for building permits and technical approvals. This may also include optional post-delivery design support for 36 months.
How to take part
Who can apply
- experience in designing water treatment stations with capacity ≥20 m³/h, including aeration, filtration, disinfection, pump systems and automation (AKPiA) in the last 5 years
- at least two completed design projects for water treatment stations meeting the above criteria
- design team must include at least one person with unlimited design qualifications in sanitary installations (water supply, sewage, heating, ventilation, gas) as project coordinator or sanitary designer
- design team must include at least one person with unlimited design qualifications in electrical and power installations
What to submit
- offer prepared using the interactive form on the e-Zamówienia Platform
- documents in Polish
- evidence of experience (list of completed projects)
- list of personnel with required qualifications
- declarations and statements as specified in the Terms of Reference (SWZ)
Award criteria
- Price (60% weight)
- Experience of the sanitary design engineer (40% weight)
Tender documents
The visible ZIP file is named '24.26K_SWZ_Z_ZALACZNIKAMI.zip' and is described as containing the Terms of Reference (SWZ) with attachments. Based on the filename and standard Polish procurement practices, this package likely includes the full tender documentation: the Terms of Reference (Specyfikacja Warunków Zamówienia), technical requirements, design brief, submission forms, contract templates, and possibly preliminary drawings or site plans. The attachments may also contain eligibility forms, qualification questionnaires, and declaration templates required for submission. However, the exact content of the drawings or technical specifications cannot be confirmed without accessing the file, and the package may include additional administrative or legal documents standard for Polish public tenders.
Source
Published on e-Zamowienia. Original title: Opracowanie koncepcji oraz projektu budowlanego i technicznego budowy autonomicznego ujęcia wody ze stacją uzdatniania wody, hydrofornią i zasobnikiem wody..
Summary and assessment prepared by Pelenoir from the public notice (23 Oct 2026). The original notice and its documents are binding. Page updated 22 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.