Architecture · Service contract
Adaptation of underground space at Opole Philharmonic for emergency shelter
Development of technical documentation and functional-utility program (PFU) for adapting the underground part of the Opole Philharmonic building into an emergency shelter (MDS).
- Deadline
- Closed 9 days ago
- Location
- Opole, Opolskie, Poland
About the project
Development of technical documentation and functional-utility program (PFU) for adapting the underground part of the Opole Philharmonic building into an emergency shelter (MDS). The project includes site assessment, inventory, technical expertise, multi-discipline conceptual design, cost estimates, and pre-tender technical documentation.
Scope of work
The project requires a comprehensive assessment of the existing underground space (approx. 371 m²), including inventory, technical expertise, and the development of a multi-discipline conceptual design and functional-utility program (PFU) for adapting the space into an emergency shelter (MDS). The deliverables must enable cost estimation and preparation of a 'design and build' tender.
Deliverables
- Technical documentation for the adaptation of underground space into an emergency shelter (MDS)
- Functional-utility program (PFU)
- Multi-discipline conceptual design (architectural, structural, sanitary, electrical)
- Pre-tender technical documentation
- Cost estimates and technical feasibility assessment
Required services
- Architectural design services
- Structural engineering design services
- Sanitary and electrical engineering design services
- Technical expertise and assessment of existing building
- Cost estimation and project planning
Pelenoir assessment
The project primarily involves the adaptation of an existing underground space into an emergency shelter, requiring a combination of architectural design, engineering services, and project management. The architectural focus includes conceptual design and space planning, while engineering services cover structural, sanitary, and electrical assessments. Project management tasks include developing the functional-utility program, cost estimation, and pre-tender documentation to facilitate future construction.
-
Architecture 50%
Architectural concept and design for adapting the underground space of the Opole Philharmonic into an emergency shelter, including space planning, functional layout, and compliance with shelter-specific requirements.
-
Engineering 30%
Structural, sanitary, and electrical engineering design services for the underground space adaptation, including technical expertise, assessments, and integration with architectural plans to ensure safety and functionality.
-
Development of the functional-utility program (PFU), cost estimation, pre-tender technical documentation, and project planning to enable a 'design and build' tender for the shelter adaptation.
How to take part
Who can apply
- Experience in developing functional-utility programs (PFU) or multi-discipline design documentation for building renovations/adaptations (minimum 250 m²)
- Coordination by a structural engineer with unlimited design qualifications and experience in technical expertise of existing buildings (minimum 250 m²)
- Architect with unlimited design qualifications
- Submission of references or documents confirming past performance
What to submit
- Offer in Polish, prepared electronically and signed with a qualified electronic signature, trusted signature, or personal signature (e-ID)
- Statement of compliance with participation conditions (Załącznik nr 2 do SWZ)
- List of services performed in the last 3 years (Załącznik nr 5 do SWZ)
- List of personnel assigned to the project with qualifications and experience (Załącznik nr 7 do SWZ)
- Commitment from resource-providing entities (if applicable, Załącznik nr 4 do SWZ)
- Joint bid statement (if applicable, Załącznik nr 6 do SWZ)
Award criteria
- Price (60% weight)
- Additional experience of the structural coordinator (40% weight)
Tender documents
The visible ZIP file, titled 'Dokumentacja postępowania.zip,' likely contains the full tender documentation package, including the Specyfikacja Warunków Zamówienia (SWZ - Terms of Reference), contractual conditions, submission forms (e.g., Załącznik nr 2, 4, 5, 6, 7), and possibly preliminary design or technical requirements for the emergency shelter adaptation. The file may also include templates for references, personnel lists, and statements required for eligibility. However, the exact contents of the drawings, technical assessments, or detailed plans cannot be confirmed without accessing the file, as only the filename and package structure are visible.
Source
Published on e-Zamowienia. Original title: Opracowanie dokumentacji technicznej i programu funkcjonalno-użytkowego (PFU) na potrzeby dostosowania części podziemnej budynku do funkcji miejsca doraźnego schronienia (MDS).
Summary and assessment prepared by Pelenoir from the public notice (11 Nov 2026). The original notice and its documents are binding. Page updated 10 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
