About the project

Preparation of functional and utility programs (PFU) for the adaptation of basement spaces in three municipal buildings (primary school, kindergarten, and cultural center) into emergency shelter facilities (MDS) in Jasionówka. The project includes site analysis, technical assessments, cost estimation, and documentation required for subsequent design-build procurement.

Scope of work

Preparation of functional and utility programs (PFU) for adapting basement spaces in three municipal buildings into emergency shelters (MDS). The scope includes site analysis, technical assessments, cost estimation, and compliance with Polish civil defense and construction regulations.

Deliverables

  • Functional and utility program (Program Funkcjonalno-Użytkowy - PFU) for each of the three buildings
  • Technical and functional requirements documentation
  • Cost estimation and work breakdown for subsequent construction phases
  • Photographic documentation of existing conditions
  • Technical assessments and expert opinions on fire safety and structural compliance

Required services

  • Architectural and engineering design services
  • Technical assessments and expert opinions (e.g., fire safety, structural integrity)
  • Cost estimation and budget planning
  • Site surveys and inventory documentation

Pelenoir assessment

The project involves the preparation of functional and utility programs (PFU) for adapting basement spaces in municipal buildings into emergency shelters. The primary focus is on architectural and design services, supported by engineering assessments and project management tasks such as cost estimation and documentation for future procurement.

  • Preparation of functional and utility programs (PFU) for the adaptation of basement spaces into emergency shelters, including spatial planning, functional layouts, and compliance with civil defense and construction regulations.

  • Technical assessments of structural integrity, fire safety compliance, and infrastructure requirements for the adaptation of basement spaces into emergency shelters.

  • Cost estimation, budget planning, and documentation required for subsequent design-build procurement phases.

How to take part

Who can apply

  • Contractor must demonstrate experience in preparing at least two functional-utility programs (PFU) or design documentations
  • At least one team member must have experience in similar projects

What to submit

  • Offers must be submitted electronically via the e-Zamówienia platform
  • Documents must be in Polish and comply with specified file formats (e.g., PDF, DOCX, ODT)
  • Qualified electronic signature (e.g., PAdES or XAdES) required for submitted documents
  • Maximum total file size for submission: 250 MB

Award criteria

  • Price (100% weight)

Tender documents

The visible document package includes three files: a PDF titled 'SWZ Opracowanie PFU MDS zm-podp.pdf' likely containing the full tender specifications and scope of work for the functional-utility program. Two ODT files, 'SWZ - zał nr 1-4 i 6-7-zm.odt' and 'SWZ - zał nr 5 Projekt umowy-zm.odt', appear to contain annexes to the tender specifications and a draft contract, respectively. The files likely include detailed requirements for the PFU, submission guidelines, and contractual terms. However, the exact contents of the ODT files cannot be confirmed without access to their internal structure.

Source

Published on e-Zamowienia. Original title: Sporządzenie programu funkcjonalno-użytkowego na potrzeby dostosowania miejsc doraźnego schronienia (MDS) na terenie gminy Jasionówka.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 6 Oct 2026.