About the project

Replacement of two ÖBB railway overpasses on the A12 Inntal Autobahn, including design, execution, detail and as-built planning for bridge reconstruction under operational railway conditions and traffic management during construction in 2028.

Scope of work

Design services for the replacement of two railway overpasses, including tender, execution, detail and as-built planning, demolition concept with ÖBB approval, and traffic management during construction in 2028.

Deliverables

  • tender planning documents
  • execution planning documents
  • detail planning documents
  • as-built planning documents
  • demolition concept with ÖBB approval
  • traffic management concept for 2028 construction phase

Required services

Pelenoir assessment

This project is primarily an engineering and technical planning assignment for the replacement of two railway overpasses, with a strong focus on structural engineering, bridge design, and construction sequencing under operational conditions. Secondary scope includes project and construction management for traffic and demolition coordination, as well as architectural design for the bridge structures.

  • Structural engineering, bridge design, technical planning for railway overpass replacement, and coordination of construction under operational railway conditions.

  • Traffic management planning during construction, coordination of demolition and construction sequencing, and client representation for compliance with ÖBB safety and operational requirements.

  • Conceptual and detailed design of the bridge structures, including aesthetic and functional integration with the existing highway and railway infrastructure.

How to take part

Who can apply

  • bidders must submit references for project managers and technical staff
  • bidders must demonstrate experience in bridge planning and railway infrastructure
  • consortia limited to maximum two members

What to submit

  • completed offer cover sheet (Deckblatt Angebot)
  • signed bidder declaration (D.6_Bietererklärung)
  • completed service description and bill of quantities (LV_D.1-D.6)
  • calculation of hourly rates (Kalkulation_Verrechnungsstundensatz_Dienstleistungen_Muster.xlsx)
  • project-specific planning and calculation documents (D.5.1_K1_Planung-Kunstbauten-Kalkulation)
  • electronic submission via www.provia.at

Award criteria

  • offered net price (weighted criterion)
  • offered quality (weighted criterion)
  • project manager and deputy references for reference projects A and B (max 100 points each)
  • technical staff references for reference project A (max 100 points)
  • project manager, deputy and technical staff education and professional experience (max 100 points each)
  • gender parity (max 100 points)

Tender documents

The visible document package includes PDF files for general tender conditions (D.1_Allgemeine_Ausschreibungsbestimmungen), contract terms (D.4_Allgemeine_Vertragsbestimmungen), project description (D.2_Projektbeschreibung), bidder declaration forms (D.6_Bietererklärung), and detailed planning and calculation documents (D.5.1_K1_Planung-Kunstbauten-Kalkulation). An Excel template (Kalkulation_Verrechnungsstundensatz_Dienstleistungen_Muster.xlsx) is provided for hourly rate calculation. A large ZIP file (Pläne.zip) likely contains bridge design drawings and plans, though its exact contents cannot be confirmed without access. The package also includes offer cover sheets and a construction sequencing document (P094_K14_S1b_Bauablauf_c_1BER.pdf).

Source

Published on Austrian Public Procurement Search. Original title: A12 ERB K14 & S1b ÖBB-Überführung - Planungsleistungen.

Summary and assessment prepared by Pelenoir from the public notice (7 Nov 2026). The original notice and its documents are binding. Page updated 4 Nov 2026.