About the project

Preparation of 1,781 zoning decisions (including changes and permits for small residential buildings) and 110 public-investment location decisions for various building types and infrastructure in Chęciny municipality. The work includes urban analysis, site surveys, drafting decisions, and participation in administrative proceedings, with possible reductions up to 20% of the total volume.

Scope of work

Deliverables

  • Projects of zoning decisions (decyzje o warunkach zabudowy i zagospodarowania terenu)
  • Projects of public-investment location decisions (decyzje o ustaleniu lokalizacji inwestycji celu publicznego)
  • Urban analysis reports and graphic attachments
  • Site surveys (inwentaryzacja urbanistyczna)
  • Draft decisions and amendments
  • Participation in administrative proceedings
  • Corrections and clarifications of decisions post-issuance

Required services

  • Urban planning and zoning analysis
  • Site surveys and urban inventories
  • Drafting administrative decisions
  • Legal and regulatory compliance analysis
  • Participation in administrative proceedings and appeals

Pelenoir assessment

The project is primarily focused on urban design and planning, specifically the preparation of zoning and public-investment location decisions for Chęciny municipality. This involves urban analysis, site surveys, and drafting administrative decisions under Polish spatial planning regulations. A secondary component involves specialist consulting for legal compliance and administrative proceedings.

  • Preparation of zoning decisions (decyzje o warunkach zabudowy i zagospodarowania terenu) and public-investment location decisions (decyzje o ustaleniu lokalizacji inwestycji celu publicznego), including urban analysis, site surveys, and drafting of administrative decisions for land-use regulation and public infrastructure in Chęciny municipality.

  • Legal and regulatory compliance analysis, participation in administrative proceedings, and corrections of decisions post-issuance, ensuring adherence to Polish spatial planning laws.

How to take part

Who can apply

  • At least one team member must hold qualifications for drafting zoning and public-investment location decisions under Polish law (art. 50 ust. 4 and art. 60 ust. 4 of the Spatial Planning Act).
  • Experience: Completion of at least 1,000 zoning or public-investment location decisions for a single client in the last three years.
  • Consortium members or subcontractors must meet the same eligibility criteria for their respective scopes.

What to submit

  • Electronic submission via the procurement platform (platformazakupowa.pl)
  • Documents must be signed with a qualified electronic signature, trusted signature, or personal signature
  • Submission of a completed offer form, declarations, and supporting documents (e.g., references, team qualifications)

Award criteria

  • Price (60% weight): Lowest price receives maximum points.
  • Time to prepare decisions (40% weight): 40 points for 7-day delivery, 20 points for 14-day delivery, 0 points for 21 days or longer.

Source

Published on e-Zamowienia. Original title: „Opracowanie projektów decyzji o warunkach zabudowy i zagospodarowania terenu oraz decyzji o ustaleniu inwestycji celu publicznego dla terenu Gminy i Miasta Chęciny”..

Summary and assessment prepared by Pelenoir from the public notice (26 Nov 2026). The original notice and its documents are binding. Page updated 25 Nov 2026.