About the project

Detail planning, fabrication, supply, and installation of district heating supply system for a new central laboratory facility.

Scope of work

Detail planning, fabrication, supply, and installation of a new district heating pipeline connection for the Zentrallabor facility. The contract covers the complete works for pipe laying and connection to the existing district heating network.

Deliverables

  • detailed planning documents for district heating connection
  • fabricated pipeline components
  • installed and commissioned district heating pipeline

Required services

  • detail planning
  • fabrication
  • supply of materials
  • installation and mounting
  • commissioning

Pelenoir assessment

This project primarily involves the technical planning and engineering of a district heating pipeline connection for a central laboratory facility, with a secondary focus on the physical construction and installation works required to deliver the pipeline system.

  • Detail planning, technical design, and engineering of the district heating pipeline connection, including system integration with the existing network and compliance with utility standards.

  • Physical installation, pipe laying, mounting, and commissioning of the district heating pipeline, including site works and connection to the existing network.

How to take part

What to submit

  • electronic submission of offers