Engineering · Service contract
Wiślana Trasa Rowerowa R-9: Cycle Path Gniew-Ciepłe
Design documentation for the reconstruction and expansion of a county road to build a cycle and pedestrian path along the Vistula River cycling route (R-9) between Gniew and Ciepłe in Gniew municipality.
- Deadline
- Closed 51 days ago
- Location
- Gniew, Pomerania, Poland
About the project
Design documentation for the reconstruction and expansion of a county road to build a cycle and pedestrian path along the Vistula River cycling route (R-9) between Gniew and Ciepłe in Gniew municipality. Includes feasibility study, environmental documentation, full design documentation, required administrative decisions (including immediate enforceability of the ZRID), geodetic works, and author supervision during construction.
Scope of work
Development of complete design documentation for a cycle and pedestrian path, including feasibility study, environmental documentation, full design documentation with required administrative decisions (ZRID with immediate enforceability), geodetic works, and author supervision during construction. The project is part of the Pomeranian Regional Operational Programme 2021–2027 under tourism infrastructure development.
Deliverables
- feasibility study
- environmental documentation (including required decisions, agreements, and opinions)
- full design documentation for road reconstruction and cycle/pedestrian path construction
- ZRID (Decision on Construction Conditions) with immediate enforceability
- geodetic works (demarcation of property boundaries, boundary markers, updates to land and building records)
- author supervision during construction
Required services
- engineering design services (road and civil engineering)
- environmental documentation preparation
- geodetic surveying
- author supervision during construction
- project management and coordination for administrative decisions
Pelenoir assessment
This project primarily involves engineering and technical planning for the design and construction of a cycle and pedestrian path, including road reconstruction and infrastructure integration. Secondary disciplines include urban design and planning for spatial coordination, surveying and geomatics for geodetic works, and sustainability for environmental documentation. The scope is focused on transport and tourism infrastructure development within a regional cycling route context.
-
Engineering 60%
Design and technical planning for the reconstruction and expansion of the county road to include a cycle and pedestrian path, including structural and civil engineering, road design, and infrastructure integration.
-
Planning and integration of the cycle and pedestrian path within the existing urban and natural environment, including spatial coordination and public-realm considerations.
-
Surveying 15%
Geodetic works, including demarcation of property boundaries, boundary markers, and updates to land and building records.
-
Preparation of environmental documentation, including required decisions, agreements, and opinions related to the project's environmental impact.
How to take part
Who can apply
- minimum one completed contract in the last 3 years for design documentation of road or cycle/pedestrian path construction, including ZRID documentation
- availability of a qualified road engineering designer with valid professional licenses and minimum 2 years of experience
- compliance with Polish Public Procurement Law (art. 112 ust. 2 pkt 4)
What to submit
- offer submitted electronically via the Polish Procurement Platform (the original notice
- completed offer form and required attachments (e.g., statements, proof of experience, personnel qualifications)
- documents in Polish
- maximum 10 files or zipped folders, total size ≤ 150 MB
Award criteria
- Price (60% weight)
- Completion time (40% weight)
Source
Published on e-Zamowienia. Original title: Dokumentacja projektowa przebudowy i rozbudowy drogi powiatowej dla zadania pn. „Pomorskie Trasy Rowerowe Wiślana Trasa Rowerowa R-9 budowa drogi rowerowej na odcinku Gniew-Ciepłe, gmina Gniew”.
Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 30 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.