About the project

Design documentation for the expansion and modernization of the wastewater treatment plant in Wadowice, including mechanical and biological wastewater treatment processes, sludge processing, and biogas systems. The project covers conceptual design, detailed engineering, and author supervision until obtaining building permits.

Scope of work

Development of conceptual and detailed design documentation for the expansion and modernization of the wastewater treatment plant in Wadowice, including mechanical and biological wastewater treatment, sludge processing, and biogas systems. The project includes author supervision until obtaining building permits and is divided into four independent design packages and one inventory study.

Deliverables

  • Conceptual design
  • Detailed design documentation
  • Author supervision documentation
  • Building permit documentation
  • Inventory study

Required services

  • Engineering design services for mechanical and electrical installations
  • Pipeline design services
  • Project supervision and documentation services
  • Cost estimation and project preparation services

Pelenoir assessment

This project focuses on the expansion and modernization of a wastewater treatment plant, primarily involving engineering and technical planning for mechanical, biological, and biogas systems. Secondary scope includes project and construction management to support the design phase and permit acquisition.

  • Design and engineering of mechanical and biological wastewater treatment processes, sludge processing systems, and biogas systems, including conceptual and detailed design documentation and author supervision until building permits are obtained.

  • Project supervision, documentation management, and coordination to ensure compliance with building permits and regulatory requirements during the design phase.

How to take part

Who can apply

  • Compliance with Polish Public Procurement Law (art. 109)
  • Required professional qualifications and experience for design services
  • Insurance for civil liability related to the project
  • Bank account or creditworthiness confirmation

What to submit

  • Completed offer form (Załącznik nr 2)
  • Statement of compliance with participation conditions (Załącznik nr 3)
  • List of completed design projects (Załącznik nr 4)
  • List of qualified personnel (Załącznik nr 5)
  • Insurance policy for civil liability
  • Bank confirmation of financial standing

Award criteria

  • Price (100% weight)

Tender documents

The visible document package includes the official contract notice (PDF), tender specifications (SWZ) with detailed scope and requirements (PDF), and multiple submission forms and templates (DOC). These likely contain the offer form, compliance statements, lists of completed projects and personnel, and a draft contract. The project description attachment (PDF) probably provides technical details about the wastewater treatment plant expansion and modernization. The files appear to cover all necessary documentation for submitting a compliant offer, but the exact technical drawings or engineering plans are not visible in the supplied context.

Source

Published on e-Zamowienia. Original title: „Opracowanie dokumentacji projektowej rozbudowy i modernizacji OŚ w Wadowicach w zakresie cz. mech. i biol. ciągu oczyszczania ścieków oraz ciągu przeróbki osadów ściekowych i cz. biogazowej".

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 1 Oct 2026.