Architecture · Service contract
Vilhelmina swimming hall renovation pre-study
Consultancy services for a pre-study to assess renovation needs of the existing municipal swimming hall in Vilhelmina.
- Deadline
- Closed 26 days ago
- Location
- Vilhelmina, Västerbottens län, Sweden
- Declared value
- SEK 1 m (≈ EUR 89 119)
About the project
Consultancy services for a pre-study to assess renovation needs of the existing municipal swimming hall in Vilhelmina.
Scope of work
Consultancy services for a pre-study to evaluate the renovation needs of Vilhelmina swimming hall. The study will inform future renovation decisions and is administered by Arvidsjaur municipality on behalf of Vilhelmina kommun.
Deliverables
- pre-study report on swimming hall renovation needs
Required services
- building consultancy services
- technical consultancy for renovation
Pelenoir assessment
The project is a consultancy pre-study for the renovation of an existing municipal swimming hall. The scope primarily supports architectural and design assessment, with a secondary focus on engineering and technical planning to evaluate the building's condition and inform future renovation decisions.
-
Architecture 60%
Assessment of architectural renovation needs, including building layout, spatial functionality, and design requirements for the existing swimming hall.
-
Engineering 40%
Technical assessment of structural, building services, and infrastructure systems to identify renovation needs for the swimming hall.
How to take part
What to submit
- completed tender documents as specified in the procurement files
- references form (Referensblankett)
- compliance with mandatory requirements (Skakrav)
Tender documents
The visible document package includes PDF and DOCX files likely containing the procurement terms, commercial contract conditions, a reference form, and invoicing rules for Vilhelmina municipality. Several PDF files with architectural drawing labels (e.g., 'Bottenplan', 'Fasader', 'A30-03') suggest floor plans, facade details, and technical drawings of the existing swimming hall. Two PDFs titled 'Förstudie inför renovering' and 'Rapport Vilhelmina badhus' likely contain previous studies or reports on the swimming hall's condition. The CLIPS file is probably the evaluation model for assessing tenders. The exact content of each file remains uncertain because access requires login and the files were not downloaded.
Source
Published on e-Avrop. Original title: Konsult för förstudie av simhallsrenovering.
Summary and assessment prepared by Pelenoir from the public notice (13 Oct 2026). The original notice and its documents are binding. Page updated 12 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.


