About the project

Framework agreement for construction client support services including project management, development, planning, supervision, and related consulting for building projects in Vienna.

Scope of work

Framework agreement for construction client support services, including project management, development, planning, supervision, and related consulting for building projects. Services cover project control, development, accompanying supervision, procedural organization, architectural object planning, and OIB guideline 1 inspection engineer services.

Deliverables

  • project management services (Projektsteuerung)
  • project development services (Projektentwicklung)
  • accompanying control services (Begleitende Kontrolle)
  • procedural organization services (Verfahrensorganisation)
  • architectural object planning (Objektplanung – Architektur)
  • OIB guideline 1 inspection engineer services (Prüfingenieur OIB RL1)
  • analysis, consulting, and management support services

Required services

  • project management
  • construction consulting
  • architectural planning
  • engineering services
  • cost calculation and monitoring
  • feasibility studies
  • project documentation and supervision

Pelenoir assessment

This framework agreement primarily covers project and construction management services for building projects in Vienna, with secondary involvement in architectural object planning and technical engineering services. The scope emphasizes client support, procedural oversight, and multidisciplinary coordination rather than standalone design or construction execution.

  • Project management, client representation, cost and schedule control, procedural organization, and construction supervision for building projects in Vienna.

  • Architectural object planning, including design development, coordination, and integration within the broader project management framework.

  • Technical engineering services, including OIB guideline 1 inspection (fire safety, structural integrity, and compliance) and engineering consulting for building projects.

How to take part

Who can apply

  • Key personnel must demonstrate professional competence and project experience
  • Selection based on criteria: 'Fachkompetenz der Schlüsselpersonen' and 'Projekterfahrung der Schlüsselpersonen'
  • No restrictive participation conditions, but compliance with Austrian federal procurement law (§ 21 BVergG 2018) is required

What to submit

  • Participation application (Teilnahmeantrag)
  • Declarations and supporting documents (ErklärungSub)
  • Electronic submission via ANKÖ Vergabeportal

Award criteria

  • Concept (30%)
  • Hearing (10%)
  • Price (60%)

Tender documents

The visible files include procedural documents and submission forms for the framework agreement. The PDF file ('Teil A der BU_WAW-BHUE_Verfahrensordnung Stufe 1') likely contains the procedural rules and conditions for the first stage of the procurement process. The two DOCX files ('Teil B_1' and 'Teil B_2') appear to be participation application forms and declaration templates required for submission. The ZIP file ('Gesamtpaket_255042') probably bundles all tender documents, but its exact contents cannot be confirmed without access. The file names suggest a focus on administrative and procedural requirements rather than technical plans or drawings.

Source

Published on Austrian Public Procurement Search. Original title: Wirtschaftsagentur Wien / Rahmenvereinbarung Bauherrenunterstützung.

Summary and assessment prepared by Pelenoir from the public notice (28 Sep 2026). The original notice and its documents are binding. Page updated 11 Sep 2026.