About the project

Update and preparation of technical documentation for urban mobility infrastructure in Venus resort, including DTAC, DTOE, execution technical project, execution details, technical specifications, documentation for permits, and technical assistance during construction and commissioning.

Scope of work

Audit of existing documentation, update and preparation of technical and execution documentation (DTAC, DTOE, execution technical project, execution details, technical specifications, quantity lists, cost estimates), integration of environmental/DNSH/climate/accessibility requirements, and technical assistance during construction and commissioning. Excludes construction execution, site supervision, and independent technical verification.

Deliverables

  • Updated DTAC (Documentație Tehnică de Avizare a Construcțiilor)
  • Updated DTOE (Documentație Tehnică de Obținere a Autorizației de Execuție)
  • Execution technical project (Proiect tehnic de execuție)
  • Execution details (Detalii de execuție)
  • Technical specifications (Caiete de sarcini)
  • Quantity lists and cost estimates (Liste de cantități și devize)
  • Documentation for permits and approvals
  • Technical assistance during construction and commissioning

Required services

  • Technical design for public works
  • Technical assistance and consultancy
  • Integration of environmental and accessibility requirements
  • Audit of existing documentation

Pelenoir assessment

This project primarily involves urban design and planning for urban mobility infrastructure in Venus resort, with a significant engineering component for technical execution and documentation. The scope covers the preparation of permitting and execution documentation, integration of environmental and accessibility requirements, and technical assistance during construction.

  • Urban mobility planning, spatial integration of transport infrastructure, and public-realm design for the Venus resort area, including coordination of technical documentation for permits and execution.

  • Technical engineering for transport infrastructure, including execution technical projects, execution details, quantity lists, cost estimates, and integration of environmental/DNSH/climate/accessibility requirements.

How to take part

Who can apply

  • Minimum annual turnover of 724,000 RON for each of the years 2023, 2024, and 2025
  • Professional liability insurance with an aggregate limit of at least 362,000 RON
  • Demonstrated experience in similar services (minimum 242,000 RON cumulative value in the last 3 years)
  • Quality management system certified to SR EN ISO 9001:2015 or equivalent
  • Compliance with exclusion grounds under Romanian public procurement law (e.g., no insolvency, no professional misconduct)

What to submit

  • DUAE (Declaration regarding the fulfillment of qualification criteria)
  • Financial statements or extracts for 2023, 2024, and 2025
  • Professional liability insurance commitment or policy
  • Certificates of tax compliance
  • Criminal record certificates for the operator and key personnel
  • Certificates or references demonstrating similar experience
  • Quality management system certificate (ISO 9001:2015 or equivalent)

Award criteria

  • Price (35% weight): lowest price receives maximum score; others calculated proportionally
  • Technical component (65% weight): methodology for audit and integration, coordination and quality assurance, environmental/DNSH/climate/circularity/accessibility compliance, experience of key experts, and technical assistance/change control

Source

Published on SEAP. Original title: Servicii de actualizare/elaborare DTAC, DTOE, Proiect tehnic de execuție,Detalii de execuție, caiete de sarcini, documentații pentru avize și asistență tehnică din partea proiectantuluipentru proiectul «Mobilitate urbană în stațiunea Venus, Municipiul Mangalia», cod SMIS 340981.

Summary and assessment prepared by Pelenoir from the public notice (9 Oct 2026). The original notice and its documents are binding. Page updated 29 Sep 2026.