About the project

Chemical supervision and waste management oversight during construction of the second stage of Vienna's U5 metro line.

Scope of work

Supervision of chemical and waste management aspects during construction of the U5 metro line's second stage, including compliance with environmental and safety regulations.

Deliverables

  • chemical supervision services
  • waste management oversight

Required services

  • engineering consultancy (Dienstleistungen von Ingenieurbüros)

Pelenoir assessment

The project scope is focused on chemical and waste management supervision during the construction of the U5 metro line's second stage. This is a specialized engineering service, with no evidence supporting additional AEC business groups such as architecture, urban planning, or construction management.

  • Technical supervision of chemical processes and waste management during metro construction, ensuring compliance with environmental and safety regulations.

How to take part

Who can apply

  • open to small and medium-sized enterprises (KMU)
  • eligibility criteria specified in tender documents

What to submit

  • offers must be submitted in German
  • electronic submission required
  • financial security required (see tender documents)

Source

Published on Austrian Public Procurement Search. Original title: Chemische Bauaufsicht U5 2.Baustufe.

Summary and assessment prepared by Pelenoir from the public notice (12 Oct 2026). The original notice and its documents are binding. Page updated 9 Oct 2026.