Project and construction management · Service contract
Turek Intermodal Transfer Centre Construction
Construction of an intermodal transfer centre building in Turek, including associated infrastructure such as demolition, construction, finishing, installation works, equipment, and site development.
- Deadline
- Closed 31 days ago
- Location
- Turek, Wielkopolskie, Poland
About the project
Construction of an intermodal transfer centre building in Turek, including associated infrastructure such as demolition, construction, finishing, installation works, equipment, and site development. The project is part of a low-emission public transport initiative in the Konin subregion.
Scope of work
Provision of contract engineer services (Inżynier Kontraktu) and supervision inspectors for all necessary disciplines during the construction of an intermodal transfer centre. The scope includes coordination, supervision, control, and settlement of construction works such as demolition, building, finishing, installation, equipment, and site development.
Deliverables
- supervision of demolition works
- supervision of construction works
- supervision of finishing works
- supervision of installation works
- supervision of equipment installation
- supervision of site development
Required services
- contract engineering (Inżynier Kontraktu)
- construction supervision (inspektor nadzoru branżowego)
- technical control and supervision
Pelenoir assessment
The project scope is exclusively focused on project and construction management services, specifically the role of a contract engineer (Inżynier Kontraktu) and multidisciplinary construction supervision for the construction of an intermodal transfer centre. No architectural design, engineering, or other AEC disciplines are being procured in this tender.
-
Provision of contract engineering services (Inżynier Kontraktu) and multidisciplinary construction supervision, including coordination, control, and settlement of demolition, construction, finishing, installation, equipment, and site development works for the intermodal transfer centre.
How to take part
Who can apply
- Contractor must demonstrate a team consisting of: 1 contract engineer (coordinator), 1 construction supervisor (structural), 1 road supervisor, 1 installation supervisor (HVAC and plumbing), and 1 electrical installation supervisor, all with valid construction licenses.
- Contractor must provide proof of experience in supervising at least one completed public building project with a minimum volume of 1500 m³ in the last 7 years.
- Contractor must submit declarations of non-exclusion and compliance with participation conditions.
What to submit
- Offers must be submitted electronically via the procurement platform (platformazakupowa.pl).
- Documents must be signed with a qualified electronic signature, trusted signature, or personal signature.
- Recommended file formats: .pdf, .doc, .docx, .xls, .xlsx, .jpg, .jpeg, with .pdf preferred for signed documents.
- Compression formats: .zip or .7z.
- Maximum file size for offer submission: 150 MB per file; 500 MB for communication.
- Submission in Polish language only.
Award criteria
- Price (60% weight)
- Presence of the contract engineer at the construction site during the week (40% weight)
Source
Published on e-Zamowienia. Original title: PEŁNIENIE FUNKCJI INŻYNIERA KONTRAKTU NAD REALIZACJĄ ZADANIA PN. BUDOWA BUDYNKU CENTRUM PRZESIADKOWEGO WRAZ Z INFRASTRUKTURĄ TOWARZYSZĄCĄ - NISKOEMISYJNY TRANSPORT PUBLICZNY W SUBREGIONIE KONIŃSKIM.
Summary and assessment prepared by Pelenoir from the public notice (21 Oct 2026). The original notice and its documents are binding. Page updated 20 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.