About the project

Design documentation for the extension of Fiszera Street in Sztum, including roads, pavements, stormwater drainage with blue-green infrastructure, sanitary sewer and water supply networks, street lighting upgrade to LED, removal of existing infrastructure conflicts, landscaping with blue-green solutions, small architecture, and road signage.

Scope of work

Preparation of multi-discipline design documentation for the extension of Fiszera Street, including conceptual design, building permit documentation, execution/technical designs, cost estimates, bills of quantities, technical specifications, traffic organisation plans, geotechnical studies, and author supervision during construction. The design must cover roads, pavements, stormwater drainage with blue-green infrastructure, sanitary sewer and water supply networks, street lighting, landscaping, small architecture, and road signage. The contractor is responsible for obtaining all necessary permits, approvals, and utility agreements at their own cost.

Deliverables

  • Conceptual site development plan with client approval
  • Multi-discipline building permit documentation (5 copies) on a 1:500 scale map with road boundary lines
  • Execution/technical designs for each discipline (3 copies each) on a 1:500 scale map with road boundary lines
  • Map for road investment permit purposes (4 copies) with road boundary lines and area calculations
  • Multi-discipline technical specifications for construction and acceptance (3 copies)
  • Bills of quantities (3 copies)
  • Investor cost estimates (3 copies) for each discipline
  • Geotechnical and water studies (3 copies)
  • Approved permanent traffic organisation plan (3 copies)
  • Editable versions of all documentation (e.g., doc, dwg, ath, pdf)
  • Three updates of the investor cost estimate upon client request
  • Responses to questions during the construction procurement process
  • Author supervision during construction

Required services

  • Architectural and engineering design
  • Traffic engineering
  • Geotechnical studies
  • Cost estimation
  • Permit and approval management
  • Author supervision during construction

Pelenoir assessment

This project is primarily an engineering-driven infrastructure development focused on the extension of a municipal street with full technical infrastructure. The scope covers multi-discipline engineering design (roads, drainage, sewerage, water supply, and lighting), urban design coordination for traffic and public-realm elements, and landscape architecture for blue-green infrastructure and outdoor spaces. The project does not include building design or interior work, and the engineering disciplines dominate the scope.

  • Design of roads, pavements, stormwater drainage with blue-green infrastructure, sanitary sewer and water supply networks, street lighting upgrade to LED, and resolution of existing infrastructure conflicts. Includes geotechnical studies, technical specifications, and execution/technical designs for all engineering disciplines.

  • Traffic organisation planning, integration of blue-green infrastructure into the street design, and coordination of public-realm elements such as small architecture and road signage.

  • Design of landscaping with blue-green solutions, including planting, open-space design, and integration of sustainable drainage features into the street environment.

How to take part

Who can apply

  • Contractor must demonstrate experience in multi-discipline design documentation for road projects (class L or higher) with accompanying infrastructure (stormwater drainage and street lighting) within the last three years
  • Contractor must employ or engage a road design engineer with unlimited design qualifications and at least 3 years of experience in road design documentation
  • Contractor must employ or engage a sanitary design engineer with unlimited design qualifications and at least 3 years of experience in sanitary design documentation
  • Contractor must employ or engage an electrical design engineer with unlimited design qualifications and at least 3 years of experience in electrical design documentation
  • Contractor must employ or engage a landscape architect for green space design

What to submit

  • Offer form
  • Statement on lack of exclusion grounds (Załącznik nr 4 do SWZ)
  • Preliminary statement on meeting participation conditions
  • List of services (Załącznik nr 7 do SWZ) with confirmation of proper execution
  • List of personnel (Załącznik nr 8 do SWZ) with qualifications and experience
  • Power of attorney (if applicable)
  • Consortium agreement (if applicable)
  • Commitment from resource-sharing entity (if applicable)

Award criteria

  • Price (60% weight)
  • Professional experience of the road design engineer (40% weight)

Source

Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowej na zadanie pn.: Rozbudowa ulicy Fiszera w Sztumie wraz z infrastrukturą techniczną.

Summary and assessment prepared by Pelenoir from the public notice (26 Nov 2026). The original notice and its documents are binding. Page updated 25 Nov 2026.