Project and construction management · Service contract
Stormwater collector construction supervision in Leszno
Leszno’s stormwater collectors will only work if the supervision team catches the small mistakes before the next downpour.
- Deadline
- Closed 40 days ago
- Location
- Leszno, Wielkopolskie, Poland
- Declared value
- PLN 247 365 (≈ EUR 55 464)
About the project
Supervision of construction works for two stormwater collector projects: Part I - construction of the Gronowo stormwater collector, and Part II - reconstruction of the stormwater collector along Kordeckiego Street, including related infrastructure adjustments and surface restorations.
Why it matters
Stormwater collectors are invisible until they fail. The supervision team’s attention to detail will determine whether residents notice the difference when the next downpour arrives.
Scope of work
Supervision of construction works for two stormwater collector projects: Part I involves construction of a new stormwater collector in Gronowo (design-build formula), including stormwater drainage network, utility relocations, and surface restorations. Part II involves reconstruction of the existing stormwater collector along Kordeckiego Street, including utility adjustments, surface restorations, and connection to the Gronowo collector.
Deliverables
- Construction supervision services for stormwater collector projects
- Inspection of design and construction works for Part I (Gronowo collector)
- Inspection of reconstruction works for Part II (Kordeckiego Street collector)
- Compliance verification with project documentation and legal requirements
Required services
- Construction supervision (inspector nadzoru inwestorskiego)
- Project management (usługi zarządzania budową)
- Site inspection and quality control (nadzór nad robotami budowlanymi)
Pelenoir assessment
The project involves the procurement of construction supervision and project management services for two stormwater collector infrastructure works in Leszno. The scope is exclusively focused on oversight, compliance verification, and quality control during construction, with no design, engineering, or physical construction activities included.
-
Supervision of construction works, compliance verification, project management, and quality control for the stormwater collector projects in Gronowo and along Kordeckiego Street, including utility relocations and surface restorations.
How to take part
Who can apply
- Minimum 5 years of experience as a construction supervision inspector for stormwater or sanitary collectors (minimum Ø500mm, 400m length for Part I; Ø300mm, 200m length for Part II)
- Valid construction supervision licenses for sanitary and road engineering works
- Experience in road surface restoration and utility relocation projects
- Compliance with Polish Public Procurement Law (art. 109, 125)
What to submit
- Signed offer form (Załącznik nr 1 do SWZ)
- Documentation of professional qualifications and experience for supervision personnel
- List of completed similar projects (Załącznik nr 5 do SWZ)
- Declaration of compliance with exclusion criteria (Załącznik nr 2 do SWZ)
- Bid bond (wadium) for each lot: PLN 3,000 for Part I, PLN 500 for Part II
- Electronic submission via platformazakupowa.pl
Award criteria
- Lowest gross price (60% weight)
- Response time for urgent site visits (40% weight; 2 hours = 40 points, 3 hours = 20 points, 4 hours = 0 points)
Source
Published on e-Zamowienia. Original title: „Pełnienie nadzoru inwestorskiego dla zadań: Część I - „Budowa kolektora deszczowego „Gronowo”, Część II - „Budowa kolektora deszczowego wzdłuż ulicy Kordeckiego”.
Summary and assessment prepared by Pelenoir from the public notice (10 Oct 2026). The original notice and its documents are binding. Page updated 9 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.


