About the project

Construction of a new extension building for the Sonnmatt primary school and daycare facilities in Oftringen, replacing existing pavilions and temporary containers. The project aims to create a vibrant, functional, and sustainable educational environment that integrates with the existing school campus and neighborhood.

Scope of work

Design proposals for a new primary school and daycare extension building, integrating with the existing Sonnmatt school campus. The project must deliver high-quality architectural, functional, and sustainable solutions that enhance the educational environment and neighborhood integration.

Deliverables

Required services

Pelenoir assessment

This project is primarily an architectural design competition for a new primary school and daycare extension, with secondary involvement of landscape architecture and engineering disciplines. The scope focuses on delivering a high-quality, sustainable, and functional educational environment through integrated design and technical planning.

  • Development of the architectural concept, building design, and overall spatial organization for the new primary school and daycare extension, ensuring functional, aesthetic, and sustainable integration with the existing campus.

  • Design of outdoor spaces, landscape integration, and open areas surrounding the new school extension to enhance neighborhood connectivity and create a cohesive campus environment.

  • Structural engineering, HVAC, and building services planning to ensure the technical feasibility, safety, and performance of the new school extension.

How to take part

Who can apply

  • Planning teams with expertise in architecture, landscape architecture, structural engineering, and HVAC engineering
  • Teams must be based in Switzerland or a WTO Government Procurement Agreement signatory state
  • Registration and payment of a refundable deposit fee (CHF 500) required

What to submit

  • Physical submission of project documents and model
  • Submission must be addressed to Gemeinde Oftringen, Bauen Planen Umwelt by 29.01.2027, 16:00

Source

Published on SIMAP Swiss procurement platform. Original title: Erweiterungsneubau Primarschulhaus Schulanlage Sonnmatt.

Summary and assessment prepared by Pelenoir from the public notice (2 Oct 2026). The original notice and its documents are binding. Page updated 28 Nov 2026.