About the project

Preparation of complete technical documentation, including approvals and obtaining the right to carry out construction works for a skatepark intended for skateboarding, rollerblading, inline skating, and BMX biking at Modrzewiowa Street in Polkowice. The project includes ensuring accessibility for people with disabilities and compliance with applicable regulations and standards.

Scope of work

Preparation of complete technical documentation for the construction of a skatepark, including obtaining necessary approvals and the right to carry out construction works. The skatepark will be designed for skateboarding, rollerblading, inline skating, and BMX biking, with a minimum area of 400 m² per referenced project.

Deliverables

  • Complete technical documentation with approvals
  • Cost estimate for the investment
  • Visualization of the skatepark
  • Documentation enabling the right to carry out construction works
  • Final documentation with all agreements and cost estimates

Required services

  • Architectural design (branża architektoniczna)
  • Project preparation and cost estimation
  • Obtaining construction permits and approvals

Pelenoir assessment

This project primarily involves the architectural design of a skatepark, including its layout, features, and compliance with accessibility and regulatory standards. Secondary aspects include landscape architecture for site integration and minor engineering for structural compliance.

  • Design of the skatepark's layout, features, and overall architectural concept, including compliance with accessibility standards and integration with the public space.

  • Design of the surrounding open space, landscaping, and integration of the skatepark with the existing outdoor environment to ensure functionality and aesthetic coherence.

  • Technical planning for the skatepark's structural elements, surfaces, and compliance with construction standards and regulations.

How to take part

Who can apply

  • Execution of at least two comparable skatepark projects (minimum 400 m² each) in the last three years
  • Availability of at least one person with architectural design qualifications under Polish construction law
  • Compliance with accessibility standards for people with disabilities

What to submit

  • Offer submitted via the e-Zamówienia Platform
  • Documents in Polish
  • Attachments as specified in SWZ (e.g., references, qualifications, declarations)
  • Electronic communication via the e-Zamówienia Platform or email (excluding offer submission)

Award criteria

  • Price (60% weight)
  • Completion time for Stage I (40% weight, between 4 to 6 months)

Tender documents

The visible ZIP file, titled 'SWZ wraz z załącznikami.zip,' likely contains the full tender documentation package, including the Specyfikacja Warunków Zamówienia (SWZ). This package probably includes contractual terms, technical requirements, and submission forms based on the filename and context. The file may also contain preliminary design guidelines or sketches for the skatepark, given the project's focus on documentation preparation. However, the exact contents of the drawings, detailed plans, or specific contractual clauses remain unknown without accessing the file. The package is intended for bidders to prepare their offers and comply with procedural requirements.

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej budowy Skateparku przy ul. Modrzewiowej w Polkowicach.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 8 Oct 2026.